Loading…
Loading…
4,854 results • Best match
FOUR LANE UPGRADATION OF OLD NH-30 OF ABHANPUR I/C. CULVERTS ,LENGTH 2.60 K.M. AT DISTT. RAIPUR.(DN. NO.3, NAVA RAIPUR).
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 A. Plant mix method (with Mechanically crushed stone only) b. For Sub-base cum drainage layer or upper sub-base with (i) Grading-V Material
Development and Rejuvenation of Dodda Arasana Kola Kalyani in Chamarajanagar City under AMRUT 2.0 Scheme.
Laying the GI Pipe 80 mm to 150 mm dia at Pole/Wall/Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting
Construction of Jhal to Nagpura Approach Road Length 17.61 km.
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 b) For Sub-base cum drainage layer or upper sub-base with ii) Grading-VI Material
SW-I Name of work:- Hubballi Division :- LD-VSG Section: Construction of RUB in lieu of LC No. 06@KM 10/200-300 in between LD-TGT station respectively by BOX pushing method. SW-II Name of work :- Hubballi Division:- LD-VSG section: construction of RUB in lieu of LC No. 07 @KM12/0-100 in TGT Yard respectively by BOX pushing method. .(Maintenance period-12 Months).Two Packets System.
1356.00 box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer- in-Charge. N o t e : (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
Missing Link Road Construction from Ayana to Ayani
Drainage spouts complete as per drawing and MoRTH specifications Clause 2705
Water body rejuvenation of Hirekere lake of Hubli-Dharwad Municipal Corporation under AMRUT-2.0
Laying the GI Pipe 80 mm to 150 mm dia at Pole/Wall/Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting