Loading…
Loading…
4,854 results • Best match
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.
construction of toilet room and shade for sub registary office and construction of boundary wall between office and residence at - Kishanpur Samastipur.
23 9.147C.1 Providing and fixing factory made uPVC white colour casement/ Casement cum fixed glazed door comprising of uPVC multi chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, zinc alloy (white powder coated) 3D hinges and one handle on each side of panels along with zinc plated mild steemulti point locking having transmission gear, cylinder with keeps and one side key, G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws, etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealent shall be paid separately). Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable.Casement door with 3D hinges made of (big series) frame 67x 64 mm & sash 67 x 110 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door upto 2.00 sqm)
Sr.DEN (C) Jurisdiction : - Rebuilding of Single Span Arch Bridges by providing RCC Box (09 Nos).
5467.50 box of all sizes with or without common web section including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Box pushing technique" as per approved drawings/scheme, with or without surcharge in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : 1. The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. 2. In case Drag Sheet and/or Rail Cluster are to be used as per approved scheme and design, the same shall be paid extra under relevant item. 3. The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.