Loading…
Loading…
4,782 results • Best match
WELCOME MAINT AND CLEANING OF OHT INCLUDING REPAIRS TO SANITATION AREA, TOILET AND BATH FITTINGS INCLUDING OTHER MISC B/R ITEMS IN MOORA AND NSV AND MHADA AREA AT MO (MB) GHATKOPAR UNDER GE (NW) BHANDUP
S & F in repairs stainles steel sink with drainage board, one mm thick sheet of steel grade AISI 304 for kitchen or laboratory, with plug, waste pipe, washers including CI cantilever bracket, connecting union etc., overall size 915 x 460 mm with bowl size 410 mm x 330 mm x 160 mm including supply and fixing bib tap CP with long body screwed for iron pipe complete all as specified and directed.
SPL REPAIR TO BLDG NO P-119 (01 TO 08) ORS MD ACCN AT KS LINE - I AT MIL STN BHUJ UNDER GE (ARMY) BHUJ
S&F sinks without drainage board made of stainless steel 1mm thick kitchen or laboratory with plugs, washers and wastes ; including bedding in cement mortar on to dwarf wall or including fixing cantilever brackets and connecting unions to pipe, overall size 495mmX420mm bowl size 410mmX330mmX160mm complete all as specified and directed.
COMPREHENSIVE MAINT, REPAIR TO SEWAGE LINE, GATE, FENCING, DRAIN, CULVERT, PERIODICAL SERVICES ETC IN THE AOR OF AGE B/R-III UNDER GE 874 EWS.
S&F in repairs kitchen sinks with drainage board made of stainless steel 1mm thick kitchen or laboratory with plugs, washers and wastes, including bedding in cement mortar on to dwarf wall or including fixing cantilever brackets and connecting union to pipe, overall size 915mmx460mm bowl size 410 mmx330mmx 160mm etc complete all as specified and as directed.
As per bid document
Installation of Air Condition including cost of extra copper pipe, necessary wire & drainage pipe as per requirement.(Installation & all Extra items are make of Daikin/ Blue Star/ ...
Construction of Jawan Kitchen Dining hall at ITBP location situated in Lapthal Valley approx. 199 km from 8th Bn Gauchar Uttarakhand
... jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Development of e-Bus Depot/opportunity charging for 100 No. e-Buses under PM e-Bus Sewa at Bemina and Harwan Srinagar
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...