Loading…
Loading…
5,111 results • Best match
CIVIL WORKS
Filling foundation and plinth with sand and watering and ramming.
Estimate for providing and laying RMC in parking , Sewerage Scheme along with its connection to the main Sewer line through Trenchless in Marble Market Sector-33, Gurugram.
[33.19]Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by `V` notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire and labour charges of air compressor, tools and accessories etc., all as per requirement and direction of Engineer-in-charge. [Through Rate]
PROVIDING SEWERAGE SCHEME IN VILLAGE TIBBER COMPLETE IN ALL RESPECT ON DBOT BASIS BLOCK AND DISTRICT GURDASPUR INCLUDING O and M FOR 5 YEARS. (Under Head 4215)
PROVIDING SEWERAGE SCHEME INCLUDING LAYING OF SEWERAGE NETWORK AND CONSTRUCTION OF SEWERAGE TREATMENT PLANT (STP) ON DESIGN, BUILD, OPERATE AND TRANSFER (DBOT) BASIS INCLUDING MAIN PUMPING STATION (MPS), RISING MAIN, HOUSE SERVICE CONNECTIONS AND ALLIED WORKS COMPLETE IN VILLAGE TIBBER, BLOCK GURDASPUR, DISTRICT GURDASPUR, PUNJAB OPERATION AND MAINTENANCE OF THE ENTIRE SYSTEM FOR A PERIOD OF FIVE (05) YEARS FOR VILLAGE TIBBER, BLOCK GURDASPUR, DISTRICT GURDASPUR, PUNJAB. (UNDER HEAD 4215)
Repair supply installation and related strengthening work of electrical mechanical equipment for smooth operation of 1.25 MLD STP SPS-1 and SPS-2 under Bhimtal Sewerage Scheme
Rates for Repair supply installation and related strengthening work of electrical mechanical equipment for smooth operation of 1.25 MLD STP SPS1 and SPS2 under Bhimtal Sewerage Scheme
RR of Sewerage Hatkoti in GP Saraswati Nagar in Tehsil Jubbal Distt Shimla HP SH Construction of septic tank tiles in Bathroom and CO Plum edge wall
Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge.
Improvement of sewerage system by replacement of old and damaged sewer line at Sidharth Gali in ward no. 199 Mandawali under EE(C-04) AC-57 Patparganj.
Improvement of sewerage system by replacement of old and damaged sewer line at Sidharth Gali in ward no. 199 Mandawali under EE(C-04) AC-57 Patparganj.