Loading…
Loading…
5,072 results • Best match
Proposed Development of Open Space in Sy.no.48/3 in Vidya Enclave in Ward no.8 at Betim, Reis Magos, Bardez-Goa.
Providing and fixing rigid PVC S.W.R. (soil, waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed:110 mm dia
COMPREHENSIVE DAY TO DAY BR MAINT WORK OF MD OFFRS QTRS AT HILL VIEW QSS QTRS and REPAIR/REPLACEMENT OF ELECTRICAL WIRING INCL ALL CONNECTED ELECT FITTINGS AND FIXTURES AT 19 AD REGT OTM ACCNS UNDER GE (I) GOS
... and fusion welded at all corners, including drilling of holes for fixing hardware and drainage of water etc., making arrangement for fixing of hardware. EPDM gasket, 1.2+ -0.2mm thick galvanised ...
CONSTRUCTION OF MULTISTOREY PARKING CUM SHOPPING COMPLEX AT RAMNAGAR, NAINITAL, UTTARAKHAND UNDER HONOURABLE CHIEF MINISTER OF UTTARAKHAND DECLARATION NO.- 309 of 2018
... jointed duly sealed at all corners, induding drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Development of Gamma Irradiation Facility (F-14) in Medical Device Park, Sector-28, YEIDA Wc-04
... required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Supply of item rate for construction materials for all types ofconstruction works under MGNREGA
uPVC coupler for uPVC drainage pipes 75 ,mm
Providing Infrastructure Facilities for Temples covered under Ekadasha Teertha Yatra Phase I (North Goa)
... necessary MS framework for structural stability Roof: Sloped FRP roof with integrated water drainage and thermal insulation and flooring.The contractor shall submit the shop drawings for... Elongation at break: 2.5%; Flexural strength (kg/cm2): 1050, Flexural modulus (Mpa) of 3200, Water absorption @25°C (mg) (after 24hours) of 20. The method-of-testing and the tolerances ...