Loading…
Loading…
5,295 results • Best match
PROVISION OF NEW FACILITY COMPRISING OF SEMINAR HALL, CONFERENCE HALL, DISPLAY HALL AND CAFETERIA FOR VISITORS AND DIGNITARY AS A SPECIAL WORK AT ARDE PASHAN PUNE
Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - IV representing __________% ___________________ percent Above / Below the lump sum price of ₹6,36,545.64 inserted by the MES in Schedule ‘A’ Part - IV
Development works of Remaining Road, Drain, sewer Line, water Line and Parks in Pocket B of Madhuban bapudham Scheme.
... (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length ...
Upgradation and Modernization of critical infrastructure work at Hydro Power Training Centre Nangal Punjab.
... required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
SPECIAL REPAIR TO BLDG NO. BK-11 AND 12 AT HIMACHAL NIWAS UNDER AGE (I) AYODHYA CANTT.
S&F in repair Sinks with drainage board made of stainless steel 1 mm thick kitchen or laboratory with plugs, washers and wastes; including bedding in cement mortar to dwarf wall or including fixing cantilever brackets and connecting union to pipe overall size 915mm x 460mm bowl size 410mm x 330mm x 160mm.
SPL REPAIR TO BLDG NO P-92 MD ACCN (01 TO 04) A KS-I LINE OF 17 PUNJAB AND PROVN OF PARKING SHED AT KS-II LINE AT MIL STN BHUJ UNDER GE (A) BHUJ
S&F sinks without drainage board made of stainless steel 1mm thick kitchen or laboratory with plugs, washers and wastes ; including bedding in cement mortar on to dwarf wall or including fixing cantilever brackets and connecting unions to pipe, overall size 495mmX420mm bowl size 410mmX330mmX160mm complete all as specified and directed.
P.way maintenance work under the section of SSE/P.Way/BDC in between
... platforms) as per direction of Engineer in- charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending ...