Loading…
Loading…
5,117 results • Best match
Clearing and removing water hyacinth and vegetative growth from SAMD Pt-II main Drainage channel in between 0 KM and 20.57 KM for a length 6.30 Km. within Block and PS - Baruipur under Mograhat Drainage Division in the District of South 24 Pgs.
Clearing and removal of water hyacinth including weeds, thich and throny floating jungles and burning them in to ashes when dry and disposal or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.
Clearing and removing water hyacinth and vegetative growth from G series of length 5480 Meter of branch channel of SAMD Pt-II main Drainage channel in Block and PS - Canning-I under Mograhat Drainage Division in the District of South 24 Parganas.
Clearing and removal of water hyacinth including weeds, thich and throny floating jungles and burning them in to ashes when dry and disposal or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.
Clearing and removing water hyacinth and vegetative growth of F series of length 3.28 Km of branch channel of SAMD Pt-II main Drainage channel in Block and PS - Canning-I under Mograhat Drainage Division in the District of South 24 Parganas.
Clearing and removal of water hyacinth including weeds, thich and throny floating jungles and burning them in to ashes when dry and disposal or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.
Laying a drainage line from Jagannath Nagar Gopala Compound to Bajrangpura under Zone No. 4, Ward No. 17.
Laying a drainage line from Jagannath Nagar Gopala Compound to Bajrangpura under Zone No. 4 Ward No. 17.
Construction of Toilets and Drainage of LGSF (Light guage steel framed structure) in Zone D at IIT Roorkee
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
Construction of Drainage work at ward no .32 Ramanna House to Gopi Hancinhal House in Gangavathi CMC Limites
Construction of Drainage work at ward no .32 Ramanna House to Gopi Hancinhal House in Gangavathi CMC Limites