Loading…
Loading…
5,126 results • Best match
CONSTRUCTION OF DRAIN FOR WATER DRAINAGE APPROACH ROAD CHANGING SHEETS OF OLD SHED INSTALLING OF MS RACK AT ESC DISTRICT MAHRAJGANJ
Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm
Construction of a CC road and drainage system from Gate No. 2 of Sahajanand Post-Graduate College to Gorabazar Main Road.
Structural Strengthening/Retrofitting work and Replacement of old damaged drainage toilet lines of Main Building at East Delhi Campus of D.T.U.
Construction of a drain for water drainage in the internal and external parts of the Prisoner Ward at Mandal Kara, Saharsa.
2 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. 129.48 Cum 287.30 37200.00 62.20266667 67.28 129.48
Rectification/modification/ Alteration of existing /new drainage system in Line 2 North (Central Secretariat Metro station to GTB Nagar Metro station).
Contract: OCM-2233 : Rectification/modification/Alteration of existing /new drainage system in Line 2 North (Central Secratariat Metro station to GTB Nagar Metro station )
Improvement of drainage of RUB NO.16A (KM 33/643), 18A ( 34/184), 23B ( KM 35/302) in PIPAR-BARA Section
cum Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.