Loading…
Loading…
29,887 results • Best match
Regar mohalle me sewerage line karya Koshithal
Suppy of Sewerage manhole cover and Frame
eProcurement System Government of Punjab Created By: Jony Kumar Created Date/Time: 20-Mar-2026 05:12 PM Tender Title: Suppy of Sewerage manhole cover and Frame Tender ID: 2026_DLG_162416_8
Laying of Water Supply and Sewerage System
Operation and maintenance for the complete scope of work mentioned in the DNIT along with all existing PHE services like Distribution, Sewerage System, 0.30 MLD Packaged Type STP, Pump chamber, CWT, 03 Nos. Tube wells etc. present in Sainik School as per O and M manual attached in the NIT for a period of 6 years after successful completion of 3 months trial run period (Note: The defect liability period of 6 years is applicable for structures/ work proposed under this agreement only (Disinfection material supplied by the Contractor) Operation and maintenance during 1st year defect liability cum Maintenance period (The A/Mtc cost will be charged to the A/ Mtc. Estimate of respective year)
Comprehensive Proposal for Infrastructure Enhancement of Sewerage Treatment Plant at Muttathara Proposal for Essential Upgrades Road Tarring Work and Solar Power System Installation Sewerage Work
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
old sewerage line replacing and new sewerage line fixing work and road construction work at various places of shahar assembly area
Providing and constructing of RR stone masonry circular manholes of "Type-A" with internal dia 0.90m and depth upto 1.65m having 300mm thick RR stone masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.
old sewerage line replacing and new sewerage line laying work and construction of road at various places of soorsagar assembly area
Providing and constructing of RR stone masonry circular manholes of "Type-A" with internal dia 0.90m and depth upto 1.65m having 300mm thick RR stone masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.