Loading…
Loading…
30,133 results • Best match
Underground Sewerage Project for Parbhani City Under AMRUT 2.0, Tal. and Dist. Parbhani
Underground Sewerage Project for Parbhani City Under AMRUT 2.0, Tal. & Dist. Parbhani Working Survey, Sewer Networks for Zone I (Total 266.71 KM) HDPE Pipe Dia 200 mm to 300 mm L=239.82 Km & RCC Pipe dia 350 mm to 1200 mm L=26.90 Km, Utility Shifting for Zone I, Property Connection for Zone I, Sewer Networks For Zone II (Total 187.69 KM ) HDPE Pipe Dia 200 mm to 300 mm L=175.68Km & RCC Pipe Dia 350 mm to 900 mm L=12.00Km, Utility Shifting for Zone II, Property Connection for Zone II, Wet Well Zone-I (10.00 m dia & 13.47 m depth ) with Mechanical Screens, Wet Well Zone-II (7.50 m dia & 11.40 M depth ) with Mechanical Screens, Rising Main 700 mm dia DIK-9 Pipe From SPS 1 to STP1 L=100 Mtr, Rising Main 600 mm dia DIK-9 Pipe From SPS 2 to STP2 L=100 Mtr, Sewerage Treatment Plant 1 & 2 Cap. 32.5 &18MLD, Sewerage Treatment Plant Cap.2.5 MLD Based on Wetland integrated technology, Road Reinstating For Zone I, Miscellaneous Charges, Nala interception at three locations for Zone 2, Grit / Silt & screen chamber for Nala interception in Zone 2, Trunk main for nala interception, Pumping machinery for SPS I & II, Trial Run for Zone I, Road Reinstating For Zone II, Trial Run for Zone II
Providing and Laying Sewerage Lines (New/Maintenance) in Zone-C of Moga City.
Providing and Laying Sewerage Lines (New/Maintenance) in Zone-C of Moga City.
Providing and Laying Sewerage Lines (New/Maintenance) in Zone-B of Moga City.
Providing and Laying Sewerage Lines (New/Maintenacne) in Zone-B of Moga City.
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME REWARI TOWN FOR THE YEAR 2025-26
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME REWARI TOWN FOR THE YEAR 2025-26
Dewatering the sewerage water from the manhole with the help of tractor tanker early dispose the sewerage water away from the site of 10 KM complete job
Annual Maintenance Sewerage Line at various spots Zone no 3 Shivajinagar, NWCMC NANDED