Loading…
Loading…
30,133 results • Best match
SH Co 14 Nos main hole chamber Under R M
Excavation in foundation trenches etc. in earth work lift upto 1.50 mtrs. stacking the excavated soil not more than 3 mtr. Clear from the edge of excavation and then returning the stacked soil in 15cm. Layer when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth all kinds of soil within all leads and lifts and as directed by the Engineer-in-charge.
SH R R of 20Mtr long wire crate embankment at RD 0 1695 to 0 1715
SH Restoration of rain damages of 200mm dia DI pipe along Kotla Nallah
Providing 25 Nos. house Sewer connection to ward no. 6 Kathlag. (Job-3)
Sub Head Supply and errection of DG set with panel for Sewerage treatment plant at Chintpurni Zone-III
Providing and Supply all accessories/Material safety body apparatus tor sewer man)
Fully body wader suit made from 0.9m to 1mm waterproof of PVC prtects the user is body from water or any other fluid till the neck height provided with water prof zipplr and scaled gloves and boots. Cbirtomized refleetive tapes and logos as per customers requirement also available.