Loading…
Loading…
30,493 results • Best match
SH R R damages of STP Rohru 1 745MLD
(SH Providing, laying, jointing and testing of DI pipe, PVC pipe, other fitting and construction of brick manhole chambers and relaying paver blocks.)
Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge
Providing UG sewerage connection arrangements in MCH building in Government Hospital at Tirupathur in Tirupathur District
eProcurement System Government of Tamil Nadu Created By: MOHAN S K Created Date/Time: 25-Nov-2025 04:43 PM Tender Title: Providing UG sewerage connection arrangements in MCH building in Government Hospital at Tirupathur Tender ID: 2025_PWD_625327_1
(SH Balance work of aluminium doors, windows, ventilators and partitions of division office (Ground Floor).
C/O Brick Masonry Manhole Chambers 4 Nos at Khaliyar Near Kendriya Vidyalaya and C/O RCC Platform 2 Nos at Mangwain Near House of Khem Chand
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge.
C/O Stone Masonry Manhole Chamber 2 No and Providing and fixing of PVC pipe 160mm and 110mm dia for temporary restoration of sewerage network in Jail road Area