Loading…
Loading…
30,802 results • Best match
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-6, Dharuhera for the year 2025-2026
NS Item -Rectifying water leakage on running lines CI/DI/AC of size 250/300 mm with cost of mat
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 4 Rewari for the year 2025 2026
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-4A, Dharuhera for the year 2025-2026
Construction of Road, Providing Water supply and Sewerage Scheme in Re- Planned Pocket in Sector-52, GGM.
[4.8.1]Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m : 1. All kinds of soil
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 4 Rewari for the year 2025 2026
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 3 Rewari for the year 2025 2026.