Loading…
Loading…
31,138 results • Best match
B03)-A/mtc. of EPHS (Sewer) in Sector-12 and 12-HBC, U/E, Panipat-Routing mtc. of sewerage lines of various size 200mm i/d to 900mm i/d including routine cleaning and desilting, attending day to day complaints of sewerage.
Maintenance of complete sewerage system including running and operation of all sewerage lines of sizes from 200mm i/d to 900mm i/d including cleaning and desilting of sewer lines. The mtc./job including desilting of sewer lines and manholes by mechanically be sorted out for attending day to day complaints, grievances to open the blockages of sewerage system as per complaints by the residents within 24 hours including providing all safety equipments and consumable items like bamboos, mustered oil, soaps, gumboot, goggles, ropes, safety belts etc. to the workmen and all other lifesaving equipments, as per requirement at site of work. Note:- The contractor may keep proper watch & ward with regard to dislocation, misplacement, damages and unauthorized use to manholes covers and other infrastructure during the working for the mtc. of sewerage system in the sectors. No manual scavenging is permitted. Size of sewer lines:- 200mm i/d. to 900mm i/d.
B12)-A/mtc. of EPHS (Sewer) in Sector-12 and 12-HBC, U/E, Panipat-Routing mtc. of sewerage lines of various size 200mm i/d to 900mm i/d including routine cleaning and desilting, attending day to day complaints of sewerage
Maintenance of complete sewerage system including running and operation of all sewerage lines of sizes from 200mm i/d to 900mm i/d including cleaning and desilting of sewer lines. The mtc./job including desilting of sewer lines and manholes by mechanically be sorted out for attending day to day complaints, grievances to open the blockages of sewerage system as per complaints by the residents within 24 hours including providing all safety equipments and consumable items like bamboos, mustered oil, soaps, gumboot, goggles, ropes, safety belts etc. to the workmen and all other lifesaving equipments, as per requirement at site of work. Note:- The contractor may keep proper watch & ward with regard to dislocation, misplacement, damages and unauthorized use to manholes covers and other infrastructure during the working for the mtc. of sewerage system in the sectors. No manual scavenging is permitted. Size of sewer lines:- 200mm i/d. to 900mm i/d.
Replacing of damaged 200 mm dia SWG sewerage line with 200 mm dia SWG line for avoiding chronic sewerage overflows from H.No.13-1-1236/A/1/B, Ganga Bowli under Allabanda Section, Sub Division-I of O and M Division-IV
Remodeling of existing old aged damaged Sewerage sewer line with 300mm dia sewerage sewer line from H.No. 2-22-115 to 2-22-130 at Navodaya Community Hall in ward No.7, Chilkanagar under Uppal Section, SD-II, O and M DN.XIV.
Road and drain development work
A/mtc estimate of water supply and sewerage scheme in sector-13 Bhiwani for the year 2025-2026
Operation of valves, Running, watch and ward 24 hours of Tubewell/machinery, Boosting Station, Water Works including repair / rewinding of all machinery and electric installations for the period w.e.f. date of allotment including EPF, ESIC, Contractor profit and other charges but excluding GST complete in all respect upto entire satisfaction of Engineer-in-Charge (per month)”. The scope of work has been given in detail as per Annexure-I