Loading…
Loading…
32,064 results • Best match
Design construction erection commission testing and commissioning of main pumping station of 4.50 MLD with peak (DNIT at the Risk and Cost of V.S. Enterprises)
Supplying & installation of 200 KVA silent DG set comprising of Water Cooled Diesel Engine Model 3R1040T G1 (CPCB Norms Compliance) developing 42 BHP @1500... Filters Double level Lubricating oil filter and lubricating oil cooler For high cooling water temperature and low lubricating oil pressure with alarm and shut down facility. Instrument ...
(SH Construction of Plate from for DG set).
... of rock) where blasting is prohibited saturated soil including bailing/pumping out of water stacking the excavated soil in 15cm layers, when required into plinths, sides of foundation... into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads and ...
C/O RCC Pillars C/O RCC Platforms C/O Manhole Chambers and Laying Jointing Testing of DI Pipes 150mm Dia 130 Rmt 200mm dia 230 Rmt 300 mm dia 50 Rmt at Jail Road Near HPPWD Circle Office
... trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and than disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting / timbering and dewatering where ever required including restoration of un-metalled / metalled paved surface ...
Hiring of Sewer suction cum jetting machine (4000 ltr capacity) with 02 Nos. helpers) for maintenance of sewerage system in Bijwasan constiteuncy under EE(C)-027.
DNIT for Operation and Maintenance of Sewerage scheme at Batala town for the year 2026 2027 w e f 01 04 2026 to 31 03 2027
DNIT for Operation and Maintenance of Sewerage Scheme of BatalaTown for the year 2026-2027 (w.e.f 01/04/2026 to 31/03/2027)
Attukal Ponkala-2026 TSS Preventive maintenance cleaning the sewer line using bucket type sewer cleaning machine at Pattoor Vanchiyoor Old Collectorate under Sewerage section 1 Kuriathy
... of Personal Protective Equipments for workmen for a period of 6 months, including 1).Water proof Rubber /Neoprene gloves to avoid body contact with septage/ sewage - 6 pairs .(The ...