Loading…
Loading…
878 results • Latest
Conservation, Restoration and Rejuvenation works of the Chola Mikirbheta Beel of Nagaon District under Assam SWIFT Project
WATER SUPPLY PIPES :- Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia Pipes. For Community Hall
Repair and maintenance of Aparajita Bhawan Near Apollo Hospital of SECL,HQ, BSP.
Providing and fixing unplasticised PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement: 4 coarse sand) and making good the wall etc. complete. : 110 mm
Water Supply to Indian Navy 4N Detachment at Olaikuda
horizontal bore by pushing / jacking method (trenchless technology method) using contractor’s machineries such as cranes, jacks, jacking materials, generator, welding machineries, compressor, jack hammer and other equipments etc. without interfering and causing any hindrance to the movement of traffic or any other vehicles, without any disturbances to the Railway/ road /canal formation etc including bailing / pumping of water where ever necessary without affecting any installation like water supply pipeline/ telephone cable, electric cables etc. passing nearby area and scooping the earth inside the pipes and pit and depositing the surplus earth in a convenient place and leveling the site after completion of entire work as directed by TWAD Engineers. The rate includes the cost of driving pit, thrust bed/wall and receiving pit to the depth of o mto 5 m excluding the cost of MS pipes
Operation and Maintenance of 7 Nos of CWSS in Madurai District
Rewinding of Motors/ Coil in pumping stations iod in the Electrical, Mechanical and Elctro- mechanical items to bring back the scheme / components into normal running conditition as per specification including all labour charges, cost of materials and all incidental charges within the stipulated time limit etc., complete as specified in Clause 2.2.6. of General conditions of Contract Part II. complete and as directed by the TWAD Board officers.
Term Contract for Artificers work in Proof Range, Dighi/Riverside/Central Magazine ,Restricted area in Ordnance Estate at AFK.
21 Approval of Material All good quality of Materials shall be brought by the contractor for incorporation in the work and shall be got checked & approved by the EIC / SIC before incorporating in the work. All ISI marked / EIC approved materials for Building materials and approved branded Electrical materials as directed by EIC shall be supplied by the contractor for incorporation in the work. Agreed for bringing material for incorporation in the work as specified/as directed/as per IS specified and approved. SELECT
SPECIAL REPAIR AND RELACEMENT OF OLD TANSFORMERS AGAINST BER OF VARIOUS UNITS OF HQ WNC AT NAVAL DOCKYARD, MUMBAI
M&L for JEF ECO SAFE Maintenance Free earthing Grounding Solution set comprising of High tensile low carbon steel rod of 3 Mts length & 32 mm dia with 250 micron ( average ) molecularly bonded copper on the outer surface to confirm with requirements of UL467 along with Back-fill compound strictly be a Carbon based conductive concrete type which has a resistivity of less than 0.12 Ohm Mtr as per Clause 14.5D of IEEE : 80 standard. Back-fill compound should be electronically conductive ( Like in metals ) and should not depend on moisture for conduction. JEF ECO SAFE compound shall be supplied in 50 Pound Bag. ( 1 Bag required per earthing set). Back-fill comound should be environment friendly, should solidify when mixed with water and set like concrete and should not leach / diffuse into the ground. A suitable earth terminaton clamp should also be supplied along with the set incl Supply of Eco Friendly weather proof High Density Polyethylene Earth Pit Chamber Note : Back-fill compund shall not be mixed with any soil while pouring in the bore hole.