Loading…
Loading…
1,034 results • Latest
PROVIDING AND REPAIRS TO LADIES AND GENTS TOILETS AT KESHAMPET POLICE STATION OF CYBERABAD COMMISSIONERATE(2ND CALL)
SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK, BUT EXCLUDING GST.
Construction of Multipurpose Hall in Plus 2 High School, Panchayat-Pakuria,(B-Pakuria)
ELECTRICAL WORKS - Wiring for light point/ fan point/exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduit, with modular switch ,modular plate, suitable GI box and earthing the point with 1.5sq mm FR PVC insulated copper conductor single core cable etc as required.
Construction of Multipurpose Hall in K.G.B.V. Pakuria, Panchayat- Bichpahari,(Block-Pakuria)
ELECTRICAL WORKS - Wiring for light point/ fan point/exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduit, with modular switch ,modular plate, suitable GI box and earthing the point with 1.5sq mm FR PVC insulated copper conductor single core cable etc as required.
PROPOSED GYM & FITNESS CENTER AT CHORVAD, DIST. JUNAGADH
construction workers regulation of equipments and conditions of service Act-1996)
Construction of RCC ESR, RCC UGR, Sunken Pump House, CC Road, Boundary Wall, Laying of CWRM, Distribution Pipeline, Pumping Arrangement, External and Internal Electrification, Automation Works
Earthing: Providing Electrical system system's earthing as per latest IS 3043, and the work shall include the following: Earthing electrodes comprising of GI pipe 40mm dia 2.9 mm thick 2.5 mtrs long with mesh covered funnel. Digging 300mm dia earthing pits to suitable depth for buring the main electrodes in the pit. The pit shall be filled with alternate layers of salt and charcoal 150mm thick around the pipe to the entire depth. An inspection chamber of 300x300x300mm size shall be constructed with CC 1:3:6 prop. The chamber shall be provided with CI/MS cover hinged to the frame. The Electrical Metering & switching , encloser electrical equipment shall be connected to the earth pit through 4 Sqmm Cu (green) for equipment/PLC earthiing.
E-Tender for Labour Work for 1 Phase & 3 Phase New Connection And Rectification work under Mahuva Rural 1 Sub Division
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods