Loading…
Loading…
11,027 results • Best match
REDEVELOPMENT OF BATASHIDHEPA WATERBODY
Providing, supplying, installing, testing and commissioning the complete MEP system for an artificial water cascade, including... pressure-rated delivery pipelines with valves, unions, strainers and flow-control arrangements, electrical cabling from panel to pump with weatherproof conduits, earthing, pump starter panel with MCB/MCCB, contactors, protection relays and auto–manual control, ...
DEMOLITION OF CERTAIN BUILDINGS AND CONSTRUCTION OF OTM ACCN OF TS AT AF STN VADODARA
Supply, installation, Testing and commissioning of Outdoor type (IP 3X), 03 way RMU (Ring Main Unit) 11 KV,... Metering Module of Class-1. RMU should be provided with internal busbars, as well as earthing busbars of electrolytic grade copper, padlock provisions & complete with all accessories. ...
Construction of meeting hall, head room, parapet wall, providing lift & other allied works to S-14 subdivision office, Jayanagar Division,BESCOM,Bangalore
ELECTRICAL WORK : Concealed Conduit System -Supplying heavy gauge PVC conduit pipe ……mm dia .. mm thick confirming to IS 2509 with suitable size bends, metal, PVC junction boxes, adhesive paste et...
Signalling interlocking works in connection with modification in interlocking at MNUR and Track Machine siding at OTP station and Signalling Modifications, Assets Renewal & system improvements in stations over Palakkad Division.
Removing/breaking of existing RCC slabs on the Passenger Platform, trenching to a 4 depth of 0.6m to accommodate the additional cables, replacing the slabs removed after the cables are laid and replastering with cement mortar, refilling the trench by ramming and consolidating it as p e r t h e instructions of Railway Representatives a t site. (Laying of cables is not included in this schedule).
Signalling interlocking works in connection with modification in interlocking at MNUR and Track Machine siding at OTP station and Signalling Modifications, Assets Renewal & system improvements in stations over Palakkad Division.
Removing/breaking of existing RCC slabs on the Passenger Platform, trenching to a 4 depth of 0.6m to accommodate the additional cables, replacing the slabs removed after the cables are laid and replastering with cement mortar, refilling the trench by ramming and consolidating it as p e r t h e instructions of Railway Representatives a t site. (Laying of cables is not included in this schedule).
COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM.
M&L for sand cushioning with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as specified and directed. Note:- Punned thickness shall be considered for payment purpose.