Loading…
Loading…
11,215 results • Best match
S&T works in connection with elimination of LC 3 & 59 in Rewari yard with construction of ROB and RUB at same location in Jaipur Division.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item 30 includes provision of labels of coloured ...
Nagar Panchayat Mursan ward no 9 kilah tanki parisar me tube well with pump house ka karya
Servo volteg stablizer having capicity 10 KVA dully copper winding three phase A.C. supply 50 Hz input voltage 250-450 output voltage 400 volt 1% with transformer oil Earthing wire and power cable.
Re-alignment of 220 KV D/C Barn-Kishenpur Transmission Line between Tower Loc.18 to 29 due to construction of permanent campus of IIM Jammu at Jagti, Nagrota
Earthing Material (Tower Accessories)
SAFETY PRECAUTION BY INSTALLATION OF INSULATING MATERIALS ON THE EXISTING STREET LIGHT POLES AT TARAMONI GHAT RD,NASKAR PARA RD,BANERJEE PARA RD AND OTHER WATER LOGGING AREAS IN WARD NO-115 UNDER BR-XIII.
(H) Street lights : 5. Supplying & Fixing GI waterproof type looping cable box size 200x150x100 mm deep having 4 mm thick comprising of one 250 V 15 A kit-kat fuse... 250 V 15 A kit-kat fuse unit, one NL on porcelain insulator, one compression type brass cable gland FOR upto 2- core 16 sqmm PVC/A cable and having lined with rubber gasketted GI top cover with brass machine screws etc., earthing ...
Providing Electrical wiring points for computes at AI Labs
Supplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 4 way (4 + 12), Double door
Janpad sambhal me bilari darni marg (Anya Jila marg) ke kul Length 11.300 km me pole shifting ka karya
Earthing complete