Loading…
Loading…
11,343 results • Best match
Construction of Malhotra community Hall Near Dev sthan of Raja Mandlik ,Pyt.Dhok khalsa, Block Bhalwal brahmana Under scheme CDF for the year 2026-27
wiring for light point/fan point/exhaust fan point/call bell with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit,with modular switch,modular plate,suitable GI Box and earthing the point with 1.5 sq.mmFRLS PVC Insulated copper conductor single core cable etc.as required(GroupA)(including socket,main box,invertor wiring and supply lane)
Janpad Deoria mein Bhikhampur Deoria karhkol marg (pra.ji.ma.) ke chainage 13.000 se 21.000 (lambai 8.000 km) tak ke bhag mein chaudikaran evam sudrdhikaran ke karya mein badhak Vidyut khambhon / transformer ke shifting ka karya
Earthing Complete
Construction of HT/LT line and erection of Distribution Transformer (DTR) for release of new connections under 33/11 kV Sub-Station D.P.H. Lohiyahad, under Head UERC / Capital S.I. scheme, including all associated works as per tender specification.
Erection of earthing rod complete in all respects as per UPCL specification
Design Supply and installation of monopole for river crossing on HTLS ACCC at Kokrajhar EC APDCL
Monopole Earthing pipe type (3m long 2hmm dia G.I Pipe including cost of all materials such as G.I pipe, G.I nuts & bolts and washer, salt, coke etc as per specification)
Supply and Fixing of Facade light at entrance gate along with 3 years of AMC at IA Sumerpur, IA Raebareli Site-II and IA Panki Site-I
Supply, installation, testing and commissioning of chemiccal earthing for panel complete in all respect.
Provision of LED street light for proper illumination at various location in ward no,17 (Jahangipuri) under Civil line Zone.
... coated pressure die cast aluminum body (System lumen efficacy >135 lm/Watt) Supplying, installation, Testing & Commissioning of Street light LED fixture, powder coated pressure die cast... project requirement. suitable to fit in up to 65mm dia pipe, life time (LED,Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ...