Loading…
Loading…
11,084 results • Best match
CIVIL AND ELECTRICAL WORKS FOR INSTALLATION OF SINK EDM MACHINE
COPPER PLATE EARTHING:Making Earth pit complete with copper plate 60 cm x 60 cm x 3.15 mm thick electrode and 25 mmx3 mm copper strip. Copper plate is to be buried directly in ground with top edge of the plate not less than 3.0 metres below normal ground level. Copper strip to be bolted with the earth plate at three points by means of copper bolts, nuts, check nuts and washers. Earth strip to be extended upto earth test point in earth chamber at ground level. Scope of work includes excavation of earth & refilling, drilling hole to electrodes, supply and covering the earth plate with alternate layer of salt and charcoal (not less than 15.0 cm on both side of plate), PCC pit and CI cover, Funnel with watering pipe, wire mesh and copper lugs etc as specified, GI protection pipe of size as specified for protection of earthing lead from top of earth plate upto earth chamber, laying copper strip of length of 5.0 mtrs connecting from test point to mainswitch or switch board or equipment and any other work necessary to complete making earth pit in all respect. Note: Earth resistance to be achived 0.5 ohms by connecting all eartpits as grid as directed by EIC
DEPOSIT-Installation of additional plugs and UPS in laboratory at PHC Kodiyeri electrification-General Electrical Work
OD234555/2024-2025:Supply , Installation , Testing and Commissioning of BIS certified 3.0 KVA Online UPS with following specification including the cost for minor electrical work for connectivity of UPS . a)Input voltage range : Single phase phase 2 wire , 230V /45-55 Hz AC , Operating voltage range 160-260 V . b ) Output capacity : 3 KVA / 72 V c)Output Waveform : True sine wave d)Output voltage : Single phase 230V AC , Voltage regulation +/- 1% e) Switching device : IGBT technology f) Metering : Digital meter with LCD display , AC input voltage , AC output voltage , Frequency , Battery DC g)Power factor : 0.9 h)Overload capacity : 125 % i) Indicators : Mains ON , UPS ON , Battery ON , charging , overload etc j)Battery C10 6 Nos Tubular battery ?40 Ah Preferably : Exide / Amaron / equivalent ( 12 V each of same rating ) k)Warranty : 4 year for battery and 3 year for UPS l)Efficiency : 90 % or above m)Battery rack : Painted MS Angle iron rack suitable for the battery supplied m) ups make : Delta/Numeric/APC /equivalent
Custom Bid for Services - For the work of shifting of poles and electrical equipment widening of 33 kV and 11 kV lines on a semi turnkey basis under the Full Deposit Scheme under the jurisdiction of the Electricity Distribution Division Tundla ... Of Electrical Systems/Electrical ... Systems/ Electrical Installations ... Systems/Electrical Installations Operation ... of Electrical Buses ... and Installation of ...
Custom Bid for Services - For the work of shifting of poles and electrical equipment widening of 33 kV and 11 kV lines on a semi turnkey basis under the Full Deposit Scheme under the jurisdiction of the Electricity Distribution Division Tundla Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Operation and Management Service of Electrical Buses Repair
Wiring
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
GENERAL PWD Quality Control Subdivision and Lab Kollam Maintenance of Electrical Installation General Electrical Work
Electrification
ELectrical
ELECTRIFICATION