Loading…
Loading…
10,092 results • Best match
Provision for installation of Power points and cable laying for Fume hood, AC and UPS in the lab no. 415 of SCS building
Supply and Cable laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required.3.5Cx 35 Sq MM AL Armoured XLPE Cable with 10SWG GI wire. Make: Polycab/Finolex/RR Kabel
Repair and Maintenance of Damaged Electrical wiring, switch, socket and associated work at AGVC staff quarter.
Supplying, Installation, Testing & Commissioning of LED surface mounted Batten light (System lumen efficacy ≥105 120 lm/Watt) of following body material and construction as per IS : 10322 with driver (Replaceable) as per the requirement with Driver efficiency >85%, Operating voltage AC 140270 Volt, frequency 50/60 hz, Operating temp range -5 °C to 40 °C, internal surge protection of 2.5 KV with Short & Open circuit protection, THD 10%, P.F.≥0.95, IP20, CRI >80, Flicker free, (flicker should be below 5 %), life time (LED, Driver & electrical circuitry), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM (Standard Deviation Colour Matching) 3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard. Manufactures Word Mark/ Name Engraved/ Embossing/ Screen printing on housing. complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 120 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management:- heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). a) 18- 22 Watt with Powder coated die cast /Extruded aluminium Body (Thickness> 1.20 mm)
Facility Management Services - LumpSum Based - Commercial; O&M of Mechanical Work, O&M of Electrical Work, O&M for Electronics Work; Consumables to be provided by service provider (inclusive in contract cost)
O&M of Electrical Work
Civil and Electrical works for Construction of Model AYUSH OPD Building in the district of Hooghly, West Bengal during the year of 2025-26 at SAD Kamarpukur RH and SAD Goghat-I
Electrical Installation works for Construction of Model AYUSH OPD Building in the district of Hooghly, West Bengal during the year of 2025-26 at SAD Kamarpukur RH. (refer detailed BOQ 1-B)
Electrical Renovation Work of Old Building (Only Indoor Portion) of Uluberia Sub-Divisional Hospital, Uluberia Howrah.
Supply, delivery and installation & testing of cubical type compartmentalized dust and vermin proof Floor cum wall mounted L.T. distribution panel, Tentative size 1500mm(H)X 1500mm(L)X 300mm(W) from CPRI approved manufacturer , made of 2 mm (14 SWG) thick C.R.C.A M.S. sheet reinforced with (40x40x6 mm) angle iron frame work with individual incoming and outgoing compartment having hinged & gasket door with locking arrangement in such a fashion that it can not be on unless the feeder remains in off position and providing suitable ventilation arrangement. The complete panel board shall be painted in seven tank process by powder coating paint, colour siemens white.The interconnection between Incoming switch and BBC should be done with tinned copper strip and BBC to all outgoing switches interconnection should be done with suitable size copper cable and other accessories including suitable stud connectors, socketing etc as required and A separate continuous GI earth busbar of size 50mm x 6mm shall run across the full length of the panel board. All electrical equipment are to be properly earthed with suitable size G.I. wire & earthing by nut, bolt in the body complete with base channel. The base of panel board should rest on frame work (75x40x5 mm). The control panel will have suitable cable entry from bottom through cable gland plate to access sufficient no. of cables as per direction of E.I.C. the panel comprising with following switches. The complete panel board is to be installed on suitable brick padestal. All incoming/outgoing switches is to be properly labelled on Acrylic sheet as per direction of EIC. (An Auto Cad Drawing of the panel has to approved by EIC before making of panel) (for G+2 & G+3 building )
Operation and Maintenance Of Electrical Systems/Electrical Installations - ABB make MV Switchgears
Operation and Maintenance Of Electrical Systems/Electrical Installations - ABB make MV Switchgears