Loading…
Loading…
10,407 results • Best match
GENERAL-e-office Implementation-Providing UPS and UPS wiring at PWD Roads Section Office, Panamaram in Wayanad District-General Electrical Work
2.3.2:Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 8 way, Double door
Construction of swachhta ghar with toilet block near Officers Institute of Ftr HQ (Spl Ops) BSF Odisha at Bangalore (SH Electrical work)
Supplying, installation, Testing & Commissioning of 12-15 watt LED Recessed/surface Down lighter (Round/ square/ Rectangular) SMD type of following body material with PMMA and prismatic diffuser and construction as per IS : 10322 with driver as per the requirement with Driver efficiency >85%, Operating voltage AC 140-270 Volt, frequency 50/60 hz, Operating temp range -5 0C to 40 0C centigrade, internal surge protection of 2.5 KV with Short & Open circuit protection ,THD 10%, P. F.≥0.95, IP20, CRI >80, UGR (Unified Glare Rating) 19, Flicker free (flicker should be below 5 %), life time (LED, Driver & electrical circuitry), life time of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Color Matching) 3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard. Manufactures Word Mark/ Name Engraved/ Embossing/ Screen printing on housing Complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted.. Shape size and CCT shall be as approved by Engineer-in Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). Powder coated die cast /Extruded aluminium Body including trim
LAC-ADS-2023-24-Construction of New Building for Govt. Muslim LP School Punnapra Ambalappuzha LAC in Alappuzha District.-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Alteration and repair works to the Recreation room to provide clear space for the new Electrical outdoor Substation at TE and Admn bldg. Compound at Bongaigaon.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
Construction of Clean Room Laboratory at First Floor for C-MET, Panchvati Pune. (Package-II) - Construction of Clean Rooms including All works of Electrical & Civil.
PROVIDING BALANCE SHEET WORK FOR SHOPS ON TOP OF COMMERCIAL COMPLEX, INSTALATION OF LIFTS AND 250 KW ELECTRICAL TRANSFORMER AT C- BLOCK ADJECENT TO SAGAR ROAD OF MMY APMC SHIVAMOGGA
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff.