Loading…
Loading…
11,193 results • Best match
Facility Management Services - LumpSum Based - District level maintenance work at the 33/11 kV electrical substation at Ashiana Powerhouse Crossing; O & M For Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - District level maintenance work at the 33/11 kV electrical substation at Ashiana Powerhouse Crossing; O & M For Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Annual Rate Contract for Laying of Power and control cable for restoration of power and control supply and feedback signals on exigency at Ash Handling Plant of Units 7 and 8 DPPS DPL under AHPEM
End termination of Power cable upto cable size 3.5C 95 sq.mm with supply of cable glands, lugs & other requisite materials
Providing 250 TR Air cooled chilled water, Air conditioner along with connected allied works etc., including providing shed and flooring at Dr. APJ Abdul Kalam Auditorium, JIPMER, Puducherry. Subwork/Packages: Electrical
1. Provision of Electrical work at Nari Niketan, Nirmal Chhaya Complex. 2. Providing and Fixing of New Air Conditioner at Child Welfare Communitee-VII, Nirmal Chhaya Complex, Hari Nagar, Jail Road, Delhi.
SH:-I- Provision of Electrical work at Nari Niketan Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS/HFFR PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size M.S. box and earthing the point with 1.5 sq.mm. FRLS/HFFR PVC insulated copper conductor single core cable etc. as required.
MOEI and fans i/c compound light in OPD POhase - I, II & III at SJH, New Delhi. SH : Electrical work of OPD Doctor and Patient toilet.
Const. of Prohibited Muddamal Shed [ Incl. Electrical Work] and Drilling of 250 MM Dia X 380 Mt. Deep Tube Well (1 Nos) At - Varahi Police Station Dist.Patan. (1st Attempt)
[Water must be poured in bore before starting earthing. Earthing value must be measured with