Loading…
Loading…
11,123 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Residential; Electrical System or Installation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Residential; Electrical System or Installation; Service Provider
Electrical (General) work in connection with "Improvement of Waiting Hall and Toilet complex and Circulating area at AGAE, DHAE, GGLE, SALE, BSAE, TBAE, KMAE, GPAE, BGRA, DTAE, SMAE, PSAE, PTAE, BGAE, BZLE, CWLE, SDI, MOREGRAM, BAA, TPF, NHT, MRR, NGF, GMAN Stations under Howrah Division".
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
Annual Rate Contract (ARC) work of Operation and Maintenance of water supply distribution network , Rising main , valve and ESR cleaning excluding of electrical items and component of Water Supply scheme (Source to User) at. Umargam Nagarpalika
cleaning excluding of electrical items and component of Water
For the Work of Maintenance of HT/LT Line Before Kanwar Yatra 2026 to Avoid any Electrical Accident in the Area of AE-I/II/III Under EE, EUDD-11 KV and LT Line-South, Meerut.
Binding & Wrapping of Plastic Panni (Polythin) on ST Pole, Double Pole, Try Pole & Four Pole, Aprox 7 feet height from ground level and tightening with Reflective Board/Light insulated Tape with completed work with material and labour in the way of Kanwar Yatra Route.
For the Work of Maintenance of HT/LT Line Before Kanwar Yatra 2026 to Avoid any Electrical Accident in the Area of AE-I/II/III Under EE, EUDD-11 KV and LT Line-North, Meerut.
Binding & Wrapping of Plastic Panni (Polythene 50 micron) on ST Pole, Double Pole, Try Pole, Four Pole & Stay Aprox 6-7 feet height from ground level and tightening with Reflected Board/Light Reflected tape with completed work with material and labour in the way of Kanwar Yatra Route.