Loading…
Loading…
10,621 results • Best match
Supply and Installation of Safety Latches on Lifting Hooks of Electric Cranes and Electric Hoists(as per scope of work)
Electric Hoists(as per scope of work)
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, DBs AND APFC AT ASTE UNDER GE (AF) MARATHAHALLI
Supply, laying riddled earth soil conformed IS-1255, cushioning to cables with a layer of riddle earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, DBs AND APFC AT AKASH VIHAR UNDER GE (AF) MARATHAHALLI
Supply, laying riddled earth soil conformed IS-1255, cushioning to cables with a layer of riddle earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW INCLUDING FPs, AND APFC AT SDI UNDER GE (AF) MARATHAHALLI
Supply, laying riddled earth soil conformed IS-1255, cushioning to cables with a layer of riddle earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
Electrification work in PHC Building at Norwa, Block Ahore, District Jalore
Supplying and fixing of power plug point with Modular accessories as per PWD specification for electrical Works, on hot dipped galvanized modular box of 1.2 mm thick with earthing terminal/connector on surface or in recessed with suitable size of modular face place with grid plate and cover plate including cost of ISI marked modular 16 amp. Switch (IS :3854) and 6/16 amp. socket outlet (IS:1293) making connection , testing , etc. as required. For specification of Wiring accessories refer Chapter E - 07 related item & For additional technical parameters of product / work refer Annexure 'A' attached with this BSR
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Left over work of Tower Wagon Shed of Sirsa and Raman Station of Hisar-Bhatinda Section (Gr.193), Provision of 3 mtrs wide FOB at Suchan Kotli, Satroad, Baraguda, Jakhod Khera, Jita Kheri & Zerpur Pali stations of Bikaner Division, Provision of an additional high level passenger platform at Ding station of Bikaner Division along with FOB & all requisite passenger amenities.
strand copper conductor cable and 1.5 sq mm PVC insulated multi strand earth copper cable