Loading…
Loading…
10,817 results • Best match
SITC of Concealed Split type AC machine in Room No 211 Teaching Bay, under RIO Medical College and Hospital, kolkata Electrical Installation Work
C. Laying of cables :---
Work contract for Complete electrification work of New ECR building along with supply of electrical material at ATPS, MPPGCL, Chachai
Laying of power cable 1.1.KV grade of size exceeding 25 sq. mm. but not exceeding 120 sq. mm
Annual maintenance Contract of the Electrical Installation Work at CMOH Office Building and DRS Building under Nandigram HD. Nandigram-I --- Deployment of manpower (For 3 years).
A.1.3 Safety & Equipment Provide caution boards such as “Men on Line”, “Don’t Switch On”, etc. Ensure all staff use proper uniforms Follow all provisions of the Central Electricity Authority Safety Regulations (2023) and ensure any non-compliant installations are corrected immediately. Adhere strictly to BIS Code 5216:1982 for electrical safety practices. Keep electrical areas (substations, switch rooms, DG rooms, cable shafts) clean and free from storage or waste. Store inflammable materials only in designated rooms built as per legal requirements. Provide proper safety gear (gloves, earthing rods, belts, resuscitation equipment) to staff. Maintain accessible first-aid boxes with standard supplies. Before electrical work: disconnect power, display warning signs, secure fuses, and obtain a “Permit to Work.” Ensure high-tension lines are fully discharged and earthed. After work: remove tools, ensure no personnel remain inside, restore normal connections, and officially close the permit before re-energizing. In case of electrical accidents: immediately switch off power, safely remove the victim using non-conductive materials, move them to safety, and provide continuous artificial respiration.
GENERAL-Nedumkandam Gramapanchayath Project Number-SO319/25-Kailasappara Sub- Centre Construction -Electrification-General Electrical Work
OD235869/2025-2026:Charges for preparing drawing of the complete Electrical installation after completion of the present work and preparing completion report with KSEB service connection application form and submitting to the consumer for availng Three phase service connection/Load regularization
Electrical TRD works in connection with OHE modification work for movement of DSDC movement: (i) OHE modification work in connection with DSDC Movement in APDJ division for the route: NJP- Y LEG - MHBA - NCB - GKJ - AYU - NBQ - CGS.
Transportation of materials from depot to work site and work site to depot. Per Track
Anual Plan-East Eleri GP-2026-27 -Electrification of Sub Centre Building at Chittarikkal FHC- Electrification - General Electrical work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C