Establishing LT Network from new ESS I-Block Sarojini Nagar , New Delhi
Ground Penetration Radar Survey (GPRS) for laying of cable
DEPOSIT-Providing Power fencing at Sub Jail, Attingal-SITC of Power fencing at Sub Jail, Attingal-General Electronics Work
... including getting out the excavated soil, refilling with sand and or good soil after laying of cable/ pipe etc in layers of 20 cm, ramming, watering ,disposal of surplus excavated soil as... watering ,disposal of surplus excavated soil as directed, within a lead of 50 metres for laying armored cables and making good the damages and concreting/refixing the interlock/ cement concrete at ...
HARDOI ROAD BASANTKUNJ YOJNA ANTARGAT SECTOR I AND SECTOR J KI VIDHUT AAPURTI HETU BANE 33/11 KV UPKENDRA KI ENTERLINKING KA KARYA
Supply of 33 kv cable /11 Kv Cable laying material for double circuit such as brick, sand stone slab of size 600x450x50mm complete with exacavation back filling, labour all complete as per direction of E/ic (Shedule 09) (Analysised on Lesa Cost Data Book/Lesa Estimate)
BOQ
... wall/free standing floor mounted dust and vermin proof compartmentalized cubical panel for electrical Works, made out of CRCA sheet. Other parameters required as per point (a) Thickness of sheet... shall be of 2.0 mm thick sheet supported by base M.S. channel if required. Side walls and cable alley compartment shaving bolted type doors with/without detachable extension type structure ...
WORK OF CONSTRUCTION OF 01 No. 33/11 KV SARDARNAGAR BAY AND SUPPLY OF ASSOCIATED MATERIALS AT 132 KV S/S SHATRUGHANPUR UNDER ETD-I, GORAKHPUR
Laying of 3.5*95sq mm size LT Power cable from LT ACDB cubical to Main ACDB for Switchyard Lighting through 50 cm below the ground level after excavation of trench of suitable size covering the cables with river sand and Ist class brick lining along and over the cable, then back filling & levelling of the trench cover after laying of cables including termination of cable on both sides with crimping of Lugs.
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) and allied works
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).