Loading…
Loading…
10,172 results • Best match
Repair and renovation of Toilet Block of Pujari, Staff Room, Toilet Block No. 2 and Other Staff at Bhawan.
Electrical Works WIRING
Development of Ghat at Shivpuri (Rishikesh) Dehradun, Uttarakhand
Electrical work
MAINTENANCE/ SERVICING AND REPLACEMENT OF LT DISTRIBUTION NETWORK AND ASSOCIATED WORK UNDER AGE E/M-I OF GE 865
Material and labour for Sand cushioning to underground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified in clause 19.75 of SSR Part-I, complete all as specified and/or as directed by Engr-in-Charge. Note : Punned thickness only will be measured and paid for.
PROVN OF CENTRIFUGAL PUMP AND ALLIED ACCESSORIES FOR WATER SUPPLY AT AULI INCLUDUNG PROVN OF HIGH MAST LIGHT, RGB STRIPS AND CONNECTED WORKS AT JOSHIMATH UNDER GE 871 EWS.
... depth up to 0.90mtrs below the ground the level and making trench of suitable width to laying 80mm bore galvanised pipe across the cross-section of the road I horizontally for passing electric cable including making good to road surface as per existing specifications or with plain cement ...
Reconductoring HT Kulakkad feeder from Kulakkad Jn. to Keezhmad Panchayath under Electrical Section Aluva Town
Fitting and erecting one HT PSC single pole in position without fitting cross arm, digging & back filling pit in ordinary soil (as per standards), drawing sufficient length of G I earthing leads from top of the post to the ground for earthing (excluding provision for earthing). For drawing HT ABC.
Transformer installation and constructing 11KV OH line
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).