Loading…
Loading…
10,163 results • Best match
Development of complete infrastructure comprising of 33 KV Power Transformers, 33 kV GIS, 6.6 kV AIS, HV and LV cables and other associated works for a reliable power distribution system for HPC High Speed Motor at NPRU, Mathura Refinery on LSTK Basi
Laying of LT Cables/OFC Cables/HDPE Pipes
CONSTRUCTING 11KV ABC LINE FROM EDATHALA S/S TO CHOONDY JN UNDER ELECTRICAL SECTION ALUVA TOWN
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
REPLACEMENT OF BER TRANSFORMER AND VCBS (IN MAIN RECEIVING STATION OF 33 KV) AT DMRL DRDO AND DLRL AREA UNDER GE I RND KANCHANBAGH HYDERABAD
Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded aluminium conductor, 11000 volts grade (E), of size 3 core 120 sq mm complete all as specified and directed.
Tender for Design, Supply, Installation, Testing, Commissioning, and Go-Live of Solar/Wind IIoT Gateway (SIG/WIG), including Communication Infrastructure, for Remote Metering and Data Communication of GEDA’s Distributed Rooftop Solar Systems and Wind Projects on a DBFOOT (Design-Build-Finance-Own-Operate-Transfer) Basis, along with Comprehensive Operation & Maintenance (O&M) and Insurance Coverage for a Period of 10 Years. Year 2026-27
electrical safety and electrical installations in India.
SITC of 1 no 16 kWp grid connected roof top Solar power plant at Building A including 5 years maintenance and S and I of Domestic Pump for UGR for Construction of Haat (stalls) for Small Garment Traders/ Manufactures at Nungi,
Laying on Wall / surface with Saddles / clamps: Laying of cable upto 3/4 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
Formation of residential layout in Haragapurgad in RS no 335/A village in Hukkeri Taluka uder Budha Basav Ambedker Niveshan yojane.under H/A 4059-60-051-0-05-423-TSP for the Year 2025-26
Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and ...