Loading…
Loading…
10,447 results • Best match
Segregation/New 33KV Lines of STD Pulwama to overcome LCP constraints of Pampore- Konibal-Lethpora Line
33 kV Isolator with out Earthing Blade (36kV,800A, Outdoor,3 poles, 25 kA)
SITC of 4 nos. Of 20 KVA direct online power back up system for modular O.T. at K.B. Bhabha Hospital, Kurla in L Ward.
Earthing Continuity Conductors -25 x 3mm Tinned copper
Pimpri Chinchwad M and R to WSS at PCIA Repairs and rectification of check metering Kiosk at WTP Rawet
Supply, installing, and testing of maintenance free earthing comprising of electrode of 17.2 mm diameter Low Carbon Steel with 250 micron molecular copper bonded earthing rod of Length 3m along with Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity (min. 125kg) complete, and recording the results specification no. EA-MF
PROVN OF GENDER SPECIFIC TOILETS AT OTM ACCN OF VARIOUS TIS OF AFS JALAHALLI PHASE II
Material and labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified and directed. Note :- (i)... sieve to separate composite particles etc. as per IS and refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned down to a depth of 10 cm above the top of upper most cable ...
Const. of 2 Different Place Aganwari Kendra in Nagar Panchayat Pisawa.
Electrification/Sanitration cost
REPAIR/ REPLACEMENT AND MAINT OF HT DISTRIBUTION SYSTEM AND OTHER CONNECTED WORKS UNDER AOR OF AGE E/M-II OF GE 865 EWS
Material and labour for Sand cushioning to under ground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified in clause 19.75 of SSR Part-I, 2009, complete all as specified and/or as directed by Engr-in-Charge.. Note : Punned thickness only will be measured and paid.