Loading…
Loading…
11,034 results • Best match
Laying of Single Circuit U/G Cable in place of Damaged Cable at 03 Nos. Various Sub-Station area in Kesco., Kanpur
Mounting and connection of all type of cable box on pole/cable post with the help of MS Clamp as well as cable laying through M.S. /G.I. Pipe the work includes proper clamping of cable box on both end of pipe. 6 inch dia ( 3 mtr. length).
Construction of Nutrition cafe at Directorate of Sports and Physical Education at University of Jammu Electrical work
Wiring for light point/fan point/ceiling fan point/exhaust fan point/call bell point with 1.5 Sq. mm FRLS PVC insulated, copper conductor cable in surface/recessed medium class PVC conduit, with piano type switch, phenolic, laminated sheet, suitable size M.S. box and earthing the point with 1.5 sq mm. FRLS PVC insulated copper conductor single core cable etc. as required. (Wire Make ISI Marked Havells/Anchor /KEI/Polycab, Plaza Conduit Make - ISI Marked Anchor/High Power /AKG) Equivalent make of required specification to be approved by the Engineer In charge) i.Group ‘A’
SITC of electrical work at various locations in the Institute.
SITC of electrical Work at Various Locations in the Institute
Custom Bid for Services - Installation of 33 KV RMU and Construction of its structure Similar Category Electric Cabling Service Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - Installation of 33 KV RMU and Construction of its structure Similar Category Electric Cabling Service Operation and Maintenance Of Electrical Systems/Electrical Installations
DEPOSIT-Mini Civil Station Kayamkulam - Child Development office-Electrification in Meeting Room and Record room -General Electrical Work
Electrification
Vappala to Thuravoor HT line construction work under Electrical Section Veliyam of Electrical Division Kundara
Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing)