Loading…
Loading…
10,447 results • Best match
REPAIR MAINTENANCE AND REPLACEMENT OF UNSERVICEABLE EXTERNAL LIGHTING INSTALLATIONS INCLUDING STREET LIGHT, HIGH-MAST LIGHTS, GARDEN LIGHTS, JUNCTION BOXES, TIMERS, POLE PAINTING AND UNDERGROUND CABLING AT ASC MADGAON AND PONDA AREAS UNDER GE PANAJI
M&L for Checking/megering of UG cable fault of any size/core and taking out the damaged portion of cable from trenches and removing the fault portion of cable and checking, jointing the same with proper cable end jointing kit and testing for smooth functioning of complete cable and re-laying the ...
As per Tender Specification TSQ-1184
2. Charges for laying of cable including excavation of ground for min. 1.5 metre depth and max. depth as per the site requirements and for laying arrangement either Trefoil or parallel as per site requirements and constraints in Normal ...
Supply installation and commissioning of one High Mast light inside Biju Pattnaik Park in w. no8 NAC Athgarh
Earth work in excavation of trenches in a l kinds of soil including B. T. Road, ordinary soil, hard... required depth & within initial lead of 50mtrs & 1.5mtrs initial lift etc. complete for laying of cable including cost of a l labour charges, T& P required for the work & as per direction of Engineer in charge. 1 x 40 Mtrs. x 0.30 Mtrs.x 0.30 Mtrs. = 3.6 ...
Supply installation and commissioning of one High Mast light inside Creamatorium near Gadasahi in w no3 NAC Athgarh
Earth work in excavation of trenches in a l kinds of soil including B. T. Road, ordinary soil, hard... required depth & within initial lead of 50mtrs & 1.5mtrs initial lift etc. complete for laying of cable including cost of a l labour charges, T& P required for the work & as per direction of Engineer in charge. 1 x 40 Mtrs. x 0.30 Mtrs.x 0.30 Mtrs. = 3.6 ...
ELECTRICAL
Cat6 UTP, OFC & Power Cable Laying Charges
SPL REPAIR/REPLACEMENT OF HT CABLE FROM 33 KV TO CAVALRY CHOWK IN CANTT AREA AND FROM CAVALRY CHOWK TO 10 NO PUMP HOUSE IN CANTT AREA UNDER GE (I) KANPUR
M&L for sand cushning to U/G cable in layers of 23cm thick (8 Cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering and consolidation, complete all as specified and directed. Note: Only punned thickness 18 cm shall be measured and paid.