Loading…
Loading…
10,575 results • Best match
S/E of PCC poles, ACSR conductyor, 200 KVA T/F and 11 mtr. long solar high mast in shopping centre sector-44 Gurugram and all other works contingent thereto (including 6 year DLP for T/F 5 year DLP for solar high mast and 3 year DLP for other items.
NS) Supply and Erection of HDPE 160mm dia (PE-63) NP-4 for laying of underground cable of 185 Sqmm X3 core XLPE armoured cable loose complete in all respect.
PROVN OF GEYSERS ALONGWITH UPGRADATION OF TRANSFORMER AT JCOS / OR MD ACCN AT SARVATRA NAGAR UNDER GE DEHU ROAD
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sq mm 3.5 core
PROVN OF 92 GEYSERS WITH TRANSFORMER AT BATHROOM OF JCOS / OR MD ACCN AT SHIVAJI ENCLAVE OF ORDNANCE DEPOT TALEGAON
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sq mm 3.5 core
Providing and fixing LED light at 220 KV Sub-Station BITHOOR Under ETD-I Kanpur
Providing and fixing of double door type junction box (MCB type with MCB) with complete fitting suitable for 230 volt AC input supply of CGL/Havells/ Standard make etc. including required 4/2 core cable laying of junction box to LED fitting & wiring from junction box to light fitting point and checking of healthiness of LEDs light.
PROVN OF HIGH MAST LIGHTS OF CERTAIN LOCATIONS AT AFAC COIMBATORE
Material & Labour for earthing complete with GI earth plate electrode 600 x 600 x 6.3 mm thick burried directly in ground... lead 25x4 mm by means of bolts, nuts, check nuts/bracing and washers all as shown in electrical plate No. 3 of SSR Part-I and including necessary excavation and earth work in any type of soil, removal and refilling of soil and funnel with wire mesh and GI watering ...
PROVIDING AND FIXING OF TRIP CIRCUIT SUPERVISION RELAY ON C and R PANEL OF 40MVA TRANSFORMER REPLACEMENT OF 33KV ISOLATORS AND PAINTING AT 132KV SUBSTATION ANANDNAGAR UNDER ETD-II GORAKHPUR.
Erection of new 36kV isolator Rama-make at the same place works also includes shifting from store to work site, Re-jumpering. Earthing after proper alignment with all cost of the skilled men & T&P and misc consumable etc. required for the job.