Loading…
Loading…
10,832 results • Best match
Construction of thirty mitar national flag work from ravidaspuram ramlila park Under Zone-5
upply and Burying of 600mX 600mmX GmmGl plate vertically for earthing with it top at least 3mtrs below the ground level complete with 20mm dia GI pipe and funnel for watering and one earthing lead of 1 no. 8 to 10 SWG Gl wire In 15mm dia Gi pipe upto switchboard (from the apron... directions of Engineer in charge complete in all respect as per drawing. (This will for earthing of poles also) UPPWD SOR No. 702
Construction of thirty mitar high national flag work from deep tiraha near police chauki Under Zone-5
upply and Burying of 600mX 600mmX GmmGl plate vertically for earthing with it top at least 3mtrs below the ground level complete with 20mm dia GI pipe and funnel for watering and one earthing lead of 1 no. 8 to 10 SWG Gl wire In 15mm dia Gi pipe upto switchboard (from the apron... directions of Engineer in charge complete in all respect as per drawing. (This will for earthing of poles also) UPPWD SOR No. 702
PROVISION OF INFRASTRUCTURE INCLUDING WORKSHOP FACILITIES FOR CASU AT DIGLIPUR AND PROVISION OF OTM AND ALLIED INFRASTRUCTURE FOR HALF DSC PLATOON AND SITE DEVELOPMENT ADJACENT TO NEW/OLD OTM COMPLEX OF CGDHQ-9 AT DIGLIPUR
Supply, install, testing & commissioning of factory made, Outdoor type 11 KV, 3 Phase, 3 way RMU with... KV,630 Amps, 21 KA LBS consists of an SF6 cubicle housing a switch disconnector and an earthing switch.Bus bars and all electrical connections are located inside the tank. The switch positions are closed-open - earthed. ...
SPL REPAIR TO LT UG CABLE AND ASSOCIATED WORKS AT OTM ACCN AT AF STN DINJAN AND UPGRADATION OF EXISTING OLD PIPE LINE INTO PPR PIPE LINE AND CONNECTED ITEMS AT OFFICER COLONY OF ASC BN UNDER GE (AF) MOHANBARI
M&L for sand cushioning to under ground cable provided with a layer of sand 8 cm depth before laying of cable and 15 cm depth after laying and stretching the cable complete all as specified and directed. Note: Punned thickness of sand shall be measured & paid.
Construction of Steel Framed Structure 100 Faculty Rooms at NSUT main Campus Sec-3, Dwarka, New Delhi during 2026-27. Civil plus Electrical.
FAN AND LED LIGHT FIXTURES Supplying, installation, Testing & Commissioning of LED Recessed/ surface Down lighter (Round/square/ Rectangular)... Glare Rating) 19, Flicker free (flicker should be below 5%), life time (LED, Driver & electrical circuitry), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till ...
El.D.C.No.Centre/1742/2026 Rewiring and additional wiring with provision of new TL fittings fans and plug points in UPSC at K B Dasan Division Office 122 Division Office 117 Unit 26 Teynampet Zone 09
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)