Loading…
Loading…
10,600 results • Best match
For Increasing Capacity Transformer
13 IPC with AL. Bail for Earthing 11 KV NOS 10
Work to relocate the transformer obstructing the construction of the Machharhatta parking facility in Ayodhya.
EARTHING COMPLETE
Installing of 100 KV TC in SWM Site Konnur
Earthing material set , Digging of pits for providing GI pipe type earthing -ordinery soil
SITC of Power Sockets for Smart Warehouse Project at FSD Partapur under DO Hapur
Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator)
Comprehensive development of Model Road, Drain, Foothpath and Improvements to parks and Improvement to Storm Water Drain and Beautification of Junctions and Construction of Multipurpose Buildings and other allied works in Govindrajnagar Constituency for the year 2026-27 (Package-GRN-2) (Annexure-3 Action Plan No. 81 and Annexure-7 Action Plan No. 2, 3, 4, 5, 8,9, 10, 11, 12, 13, 14, 15, 18, 22 )
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff - LT Cable - 2.5 to 25 Sqmm.
CONSTRUCTION OF 1918 UNITS HAVING 35 SQ.MT. CARPTE AREA EWS HOUSES INCLUDING INTERNAL INFRASTRUCTURE & DEVELOPMENT WORK AT THE PLOT AT TP.75 (MUTHIYA-HANSPURA) FP.87 IN NORTH ZONE OF AHMEDABAD CITY
electrification, water supply, drainage, storm water