Loading…
Loading…
10,630 results • Best match
Morbi RoB, LC-34B under SJMMSVY (3rd invitation): Construction of Proposed Two Lane Railway Over Bridge (RoB) in Lieu of LC No.34 B at Rly. Km. 29/4 to 29/5, Between Morbi – Navlakhi Station on WKT – NLK Section on Morbi – Navlakhi Road” Under programme of SJMMSVY
depth in existing trench for laying of cable. below
Design, Supply, Erection, testing and commissioning of 25 KV AC-OHE and modification of TSS/SP/SSP of Harbour Line between Goregaon and Borivali (TRD/PSI Work) under Mumbai Division of Western Railway.
Drilling of horizontal boring below track by pushing method for laying of cable of various size upto 450 mm dia
Providing New Power Pump in Borewell and Supply of Panel Board and UPVC Pipes in PVG Nagar and Rajmmal Layout Ward No.27
... of submersible pumpset in borewell / openwell including fixingand jointing submersible cable with properclamps upto the starter to required depth andalso fixing of riser pipes to... three pilot(indicating) lamps capacitor single phasingpreventor, water level guard and laying andjointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Providing New Power Pump in borewell and Supply of Panel Board and Cables in Bharathi Nagar in Ward No.13
... of submersible pumpset in borewell / openwell including fixingand jointing submersible cable with properclamps upto the starter to required depth andalso fixing of riser pipes to... three pilot(indicating) lamps capacitor single phasingpreventor, water level guard and laying andjointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
REPAIR / REPLACEMENT OF OUTDOOR ENERGY EFFICIENT LUMINARIES AND FLOOD LIGHTS ALONG WITH CONNECTED WORKS IN SECTOR C UNDER AGE E/M-I OF GE 865 EWS
Material and labour for Sand cushioning to underground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified in clause 19.75 of SSR Part-I, complete all as specified and/or as directed by Engr-in-Charge. Note : Punned thickness only will be measured and paid for.
SPECIAL REPAIR TO SOUND PROOFING AND ASSOCIATED B R WORKS AT AF STATION HALWARA UNDER GE (AF) HALWARA
Supply, laying & testing cable XLPE cross sectional area 50 Sqmm 3.5 core, 1100 Volt insulated, armoured heavy duty electric cable with stranded aluminium conductor Confirming to relevant IS complete all as specified and directed by Engineer-in-charge.