Loading…
Loading…
10,842 results • Best match
As per NIT04
Electrical Work :
Transgrid down stream works at 110kV substation TERLS Renewal of Control Cable Connections for CT PT Circuit Breaker Bus Isolators and Lightning Arresters of 20 MVA Transformer Unit 2 necessitated by Transformer Repositioning
Lifting cement concrete slabs/ chequered plate from cable trench for laying cable and placing the slabs carefully to the sides of the trenches and again placing the slab in orginal position after cable laying work is completed
Augmentation 33 11 KV Receiving station Karanagar from 2X10MVA TO 3X10MVA
Earthing of 100 KVA SubStation--Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI... Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 75 mm x10 mm & 50 mm x 6 mm for connection of transformer body,G.O Set & lightening ...
Upgradation of Kalapetty-Kannampully 66kV SC to 110kV DC line
Providing earthing in terminal tower as per standard specification by providing 150mm dia bore hole for ...
GRAM MALENDI MAI BARAT GHAR NIRMAN KARYA
Wiring for light point/fan point/exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface/recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size M.5. box and earthing the point with 1.5 sq.mm. FRLS PVC Insulated copper conductor single core cable etc. as required. as St No. 1.8.1 DSR (EAM), 2022
Construction of Phase-B (Bal.) work at Jawahar Navodaya Vidyalaya (JNV) in the districts of Jharsuguda, Rayagada in Odisha
ELECTRICAL WORK