Loading…
Loading…
10,428 results • Best match
Electrical work for Upgradation of Electrical Assets in quarters,rest house,waiting halls & other locations over Moradabad Division (Phase-I).
including making chase & plastering after laying of cable/digging of cable trench, sand cushioning,
LAC-ADS-2022-2023- Mattannur LACSmt. Shylaja Teacher MLA - Construction of new building for Menachodi Govt UP School.- Electrification-General Electrical Work (Re-Tender)
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Tank Filling scheme for filling 32numbers of MI/ZP tanks of gudavi(Head works consisting of construction of Barrage, in take trough with forebay, Jack well cum pump house, ... house electrical works, ... electrical works , ... system, electrical panel, ... the work for ... scheme works on
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Tank Filling scheme for filling 32numbers of MI/ZP tanks of gudavi(Head works consisting of construction of Barrage, in take trough with forebay, Jack well cum pump house, vertical turbine pumps coupled to motors, pump house electrical works, necessary valves, delivery pipe, manifold system, electrical panel, soft strater, capacitors, 11KV transformer, 11/0.433 KV sub station, 11 KV power line and 11 KV terminal bay, r
Custom Bid for Services - ANNUAL MAINTENANCE CONTRACT FOR ELECTRICAL & INSTRUMENT ELECTRONIC CARDS REPAIR SERVICES AT BPCL, BINA REFINERY FOR THE PERIOD OF THREE YEARS Similar Category Operation and Maintenance Of Electrical Systems/Electrical ... Systems/Electrical Installations Repair, ... and Installation of ... and Installation of ...
BINA REFINERY FOR THE PERIOD OF THREE YEARS Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair
Additional Work at OPD Building MDM, Jodhpur. (RCI) (Excluding Cost of Cement and Electrical Work)
Structural steel work welded in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete above plinth level up to 4.5 Mtr. height in R.S. Joists flats, tees, angles and channels.
Custom Bid for Services - AMC of VFD Panels 2026-27 Similar Category Customized AMC/CMC for Pre-owned Products Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Custom Bid for Services - AMC of VFD Panels 2026-27 Similar Category Customized AMC/CMC for Pre-owned Products Operation and Maintenance Of Electrical Systems/Electrical Installations Repair