Loading…
Loading…
10,864 results • Best match
Construction of Rest House for Track Machine staff and allied works at BVR, DRU and TTR.
PVC conduit / Casing & capping, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLSH / HFFR PVC insulated copper conductor single core cable etc. as required. (Group - A). NS 36.00 Each 545.00 19620.00 AT Par 19620.00
Re-Alignment of 220KV D/C Thein-Hiranagar Transmission Line between Tower Loc. No. 105 to 109 (Due to damaged Tower No. 107 in Ravi River) and released allied works
Earthing Material (Tower Accessories)
Removal of existing compressor in borewell and providing 7.5 HP submersible motor pumpset, Delta starter, UPVC pipes and cables at Sirupooluvapatti Aadhidravidar colony, Sirupooluvapatti and solipalayam in ward no 25
... of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes... three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Evacuation of Power from 33 11 KV 3.15 MVA Receiving Station Dali-Udyanpur through three number of 11KV Feeders under the jurisdiction Electric Division JPDCL Doda
Earthing Complete by GI Rod 20mm 2.5 mtr long through GI Strip.
SITC of 03 No. 4Way High mast lights at Illahi bagh grid,Rangpora Chowk near Jamia Masjid and Parray Mohalla Rangpora.
Earthing of Octagonal Pole Complete by GI Pipe 40 mm or GI Rod 20mm 3 mtr long through GI Strip (25x3)mm
Running, maintenance and operation for submersible pump sets, sewage submersible pump sets and general lighting at Sector-16A and Running, Maintenance and Operation of Sub. Pump set at Dhobi Ghat, Sec-16B, Dwarka
... F.≥0.95, IP20, CRI >80, Flicker free, (flicker should be below 5 %), life time (LED,Driver & electrical circuitary), of minimum 50000 Burning Hours with , 70% of initial Lumen maintained till... respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 120 lm/Watt ...