Loading…
Loading…
60,655 results • Best match
Parakkad Kudumbasree Hall Electrification Chelakkara G P Project no S00 14 2026 General Electrical Work
eTendering System Government of Kerala Created By: JAYAN EDUVANAMPOIKAYIL GOPALAKRISHNA Created Date/Time: 27-Jan-2026 12:46 PM Tender Title: Parakkad Kudumbasree Hall Electrification Chelakkara G P Project no S00 14 2026 General Electrical Work Tender ID: 2026_LSGD_827946_12
Annual Plan-Pooyappally GP S0275/26 -Electrification of Pooyappally Market MCF Shed-General Electrical Work
eTendering System Government of Kerala Created By: SANTHI R.S Created Date/Time: 21-Oct-2025 01:09 PM Tender Title: Annual Plan-Pooyappally GP S0275/26 -Electrification of Pooyappally Market MCF Shed-General Electrical Work Tender ID: 2025_LSGD_807706_4
Renovation, modification and alternation of Internal Electrical Installation works at Wildlife Squad II, Malbazar Range under the jurisdiction of Gorumara Wildlife Division, Jalpaiguri for the year 2024-25.
eProcurement System of Government of West Bengal Created By: DWIJAA PRITAM SEN Created Date/Time: 18-Mar-2025 06:25 PM Tender Title: Renovation, modification and alternation of Internal Electrical Installation works at Wildlife Squad II, Malbazar Range under the jurisdiction of Gorumara Wildlife Division, Jalpaiguri for the year 2024-25. Tender ID: 2025_DOFR_819785_1
Electrical Repairing and Renovation works at Taldangra BPHC Under Bankura Electrical Division.
Inter Connection: All interconnection of switches & bus bar Shall be made with required sizes of multi strand PVC insulated copper wire to be kept for Cable connection for main switches & the end of all connections of metering panel to be finish with Copper socket by crimping method having Marked ferrule for indication. Earthing. A separate earth bolts/Bars – 2 Nos will be provided in panel board in both sides as per drawing. Cable Alley: Cable entry arrangement will be provided in the cubical panel in vertical position of size with reqd sizes of AC/DC make connector indicating phase & neutral for each outgoing main switches & gland plate must be placed at the bottom of the panel with detachable type as per direction of E.I.C. Painting. The complete panel board shall be painted by 2 coats of powder coated synthetic enamel Paint over two coats of R.O. primer of Approved make & brand & color as per Direction of E.I.C. Constructural Details: All incoming & outgoing panel mounted cubical Switch disconnector fuse shall be housed in Respective compartment with hinged & gasketted Door at front. All doors shall have Panel lock Arrangement. The panel shall be properly Gasketted to prevent ingress of dust & moisture & Remaining . Busbar will be properly arrange & all Switches shall be fixed by M.S. nuts & bolts On angle /flat iron frame base.as per direction of E.I.C. Installation : The panel should be installed as per site condition & requirement with brick pedistal / foundation etc to comp the installation as per Direction of E.I.C. .
Vertical Extension of proposed 1 st Floor Govt Model School Canning II South 24 Pgs Electrical Installation Work
Construction work of New Primary Health Center Building at Kanechankalan (Electrical work) (Remaining electrical work)
Providing & Fixing of Electrical insulating rubber matts as per PWD specification for electrical Works, ISI marked confirming to IS: 15652 / 2006 with one side anti skid abberation marks and pasting the mat with synthetic rubber adhesive as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .