Loading…
Loading…
60,902 results • Best match
Electrical installation work including SITC of AirConditioning system for integrated CCTV surveillance room at ground floor South Block Bikash Bhawan Salt Lake Kolkata91
Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
GENERAL-GENERAL-GUPS Arimpur - Phase 2-Construction of new building with multipurpose hall and hitech classrooms for GUPS Arimpur - Phase II-General Electrical Work-Electrification-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
DEPOSIT-SITC of lift at Factories and Boilers- Supply Installation Testing and Comissioning of 10 passengers lift at Factories and Boilers Kumarapuram Thiruvananthapuram-General Electrical Work
Work Name:DEPOSIT-SITC of lift at Factories and Boilers- Supply Installation Testing and Comissioning of 10 passengers lift at Factories and Boilers Kumarapuram Thiruvananthapuram-General Electrical Work
Electrification work
90.2.1.8:Supply and wiring points according to IS 732-1989 using rigid PVC conduit of minimum size 20 mm with specials conforming to IS 9537 part III 1983 and with suitable size specials conforming to IS 3419-1988, fixing the conduit using metal saddles spacing not exceeding 50 cm or concealed suitably and with 1.00 sq mm FRLS PVC insulated stranded single core copper conductor cable 650V grade, including providing switch board main and continuous earthing with No.14 SWG bare copper,required quantity of copper earth socket, brass bolt and nut crimping/ soldering etc complete with suitable size modular type metal switch boxes, modular type front plates (white) etc. up to and including 6A modular type SP switches and making good the surface of wall, colour washing etc. complete. All the terminations in the switch boards and DB's shall be tinned and the wires shall be drawn and fixed along the periphery of the box using suitable ties, tie mounts etc as required. (RoHS compliant modular accessories).Single Control light point with 6A, plate ceiling rose - Medium Point
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - Laying down of new Optical Fiber Cable; Laying down of new Optical Fiber Cable
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - Laying down of new Optical Fiber Cable; Laying down of new Optical Fiber Cable
Electrical Installation work for SITC of Air-conditioner machines at 2nd Floor, Block-IV, of Pension Branch, Finance Department at Writers Buildings.
S&F double door 6-Way Vertical TPN MCB Distribution board for MCCB incomer with IP-42/43 protection, on angle iron frame on wall incl. Inter connection & provision for earthing attachment (Schneider/Legrand/ ABB )