Loading…
Loading…
60,945 results • Best match
INSTALLATION OF ELECTRICAL PANEL DEDICATED TO SHREEDER MACHINE UNIT AND CABLE LAYING UNDER ASPHALTUM DEPARTMENT GORAGACHA.
Providing 10KVA UPS and connected Electrification Works
OD198130/2025-2026Supply, installation, testing and commissioning of a 10 kVA Online Double Conversion UPS with an inbuilt isolation transformer, having 3-phase input and single-phase output, suitable for continuous and reliable power backup. The system includes 20 Nos of 12V, 60Ah tubular lead-acid batteries configured to provide 1- hour backup . A durable battery stand is included for safe installation. The UPS features advanced protections (overload, short circuit, deep discharge), intelligent battery management, and a user-friendly display panel. Both the UPS and batteries come with a 3-year warranty, ensuring long-term performance and reliability.
Annual maintenance of Electrical Installation work Internal and External incl. operation of PD College RHE, Jalpaiguri on all working days incl Saturday, Sunday and Govt. Holidays for Twelve months.
Annual Maintenance of all internal and external electrical installation works of staircase, compound/street lights, glow sign board, Electrical panel board, Feeder Pillar box etc incl. day to day operation of pump motor sets & its different valves attached with the pump lines & minor electrical repairing works for pump motor sets everyday including saturday, Sunday & Govt. Holidays as per attached Terms & condition by deputing 1 no. Skilled Electrician in one shift per day(from 2.00 PM to 10.00 PM) & 1no. Semi-Skilled labour in another 1shift per day (from 6.00 AM to 02.00 PM) for period of 12 (twelve) Months. Daily labour charges for engaging 1 no. Skilled Electrician in one shift per day(from 2.00 PM to 10.00 PM) incl. charges for EPF, EDLI & ESI contribution as per relevant Labour Act/Rules and bonus (as per Payment of Bonus Act'1965).
Revamping Electrical Works, EB Service and Lighting for the work of Conservation, Renovation and Restoration of Heritage Building of Langa Building and Tokkoya Building in E.V.R Periyar College at Tiruchirappalli in Tiruchirappalli District.
Earthing as per the ISI specification with an earth electrode of 2.1mt class 'B' GI pipe of dia not less than 40mm, with copper earth plate of size 125mm x 50mm x 6mm, with necessary funneling arrangements with necessary masonry work and with 38mm RCC cover slab for the brick masonry.
Electrification of open-air auditorium for Government Higher Secondary School, Chattukappara-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
GENERAL Repair and replacement of damaged electrical fittings in Vigilance amp Anti corruption Bureau office at Malappuram Electrification General Electrical Work