Loading…
Loading…
64,089 results • Best match
Laying of underground cable in place of defective UG cable at Old hostel fault finding of existing UG cable and repairing at NDRF campus, Nagpur
Central Public Works Department
Construction of New ILS Building at Khajuraho Airport SH-Electrical Works.
Wiring for light point / fan point / exhaust fan point / call bell point with 1.5 Sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 Sq.mm FRLS PVC insulated copper conductor single core cable etc. as required. a) Group B
Civil works for development of Co-working place at 1st floor of Nehru Place PO Building and renovation of Electrical installation i/c provision of Fan, fittings, computer points, fan cabling and air conditioning for works station at Nehru Place PO
Electrical Installation work for replacement of faulty cable for outdoor lights and replacement of defective light fittings at Indoor and outdoor at Inspection Bunglow, PWD, in the District of Bankura.
Supplying and Fixing Sintex SMC water proof looping cable box (Make:- Sintex Cat. No.GSMB 2525 or its equivalent ) having rubber gasket lining, locking arrangement, earthing terminal with lug etc. of the following sizes as indicated below, Comprising of one 250 V, 15 A Kit-Kat fuse unit one NL on porcelain insulator or equivalent rating SP MCB etc. and housing the same in pole muffing incl. addition and alteration to the existing CC muffing (6:3:1) after dismantling the damaged looping cable box etc. where necy. incl. painting as per direction of EIC. 250 x 250 x 160mm [NS]
DEPOSIT-Electrification of sub office of Arattupuzha matsya bhavan at Kayamkulam Electrification of sub office of Arattupuzha matsya bhavan at Kayamkulam-General Electrical Work
1.10.1:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group A
Annual Maintenance of Electrical Installation of whole system at Netaji Subhas Administrative Training Institute Salt lake Kolkata----Replacement of HPSV light fitting by LED fittings and allied E.I work
Laying of cable as below, on existing Cable Tray and binding with suitable size GI wire/cable tie. i) Up to 50 sqmm