Loading…
Loading…
64,160 results • Best match
Supply, Installation, Testing and Commissioning of 2 Nos 3TR Tower Air Conditioners and Shifting of UPS Connections with Associated Electrical Works in Room No 310 Server Room of the RnD Section IITG Campus
LED Panel light 2x2 ft. (System lumen efficacy ≥105 120 lm/Watt): Supplying, installation, Testing & Commissioning of Panel light 2x2 ft., of following body material and construction... Glare Rating) 19, Flicker free, (flicker should be below 5 %), life time (LED,Driver & electrical circuitry), of minimum 50000 Burning Hours with, 70% of initial Lumen maintained till ...
Electrification / Electrical work of Shri Shivnath Agarshala building at Shivnathi Shiroda Goa of V.P. Shiroda of Shiroda Constituency under MLA LAD Scheme.
Earthing with GI earth pipe 2 mts long 40 mm dia medium class with ISI mark, of approved brands,... arrangement and watering pipe etc. with charcoal or coke and salt as required as per the Earthing Drawing provided by the Engineer-Incharge. The scope of work includes the following: ...
RMO Electrical , Mechanical Works at various Buildings under M-4512 (SH- Comprehensive Maintenance of various capacity DG Sets installed at VVIP Premises).
eTendering System Government of NCT of Delhi Created By: Vishnu Avtar Gupta Created Date/Time: 30-Dec-2025 03:46 PM Tender Title: RMO Electrical , Mechanical Works at various Buildings under M-4512 (SH- Comprehensive Maintenance of various capacity DG Sets installed at VVIP Premises). Tender ID: 2025_PWD_283298_1
Facility Management Services - LumpSum Based - Healthcare; Electrification and Electrical Maintenance Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Healthcare; Electrification and Electrical Maintenance Work; Consumables to be provided by service provider (inclusive in contract cost)
Utilily Shifting Work (Electrical) on Widening Work of Achpura Kasindra Road
Supply and installation of spike of M.S. rod 20mm dia 3.0mtr. long for earthing of (tower/pole) drive into earth by mechanical means sturcture connection the spike with cross arm top hamper PCC pole, lattics tower to earth etc. complete as per technical specification of DISCOM.
DEPOSIT-NAGALASSERY VILLAGE OFFICE -Construction of Nagalassery Smart Village Office-new building-Electrical workGeneral Electrical Work
Electrification