Loading…
Loading…
64,135 results • Best match
GENERAL-One Year Running Maintenance Contract for various office in District Civil Station Kakkanad, Ernakulam.- Maintenance work - General Electrical Work
Work Name:GENERAL-One Year Running Maintenance Contract for various office in District Civil Station Kakkanad, Ernakulam.-Maintenance work -General Electrical Work
Annual Maintenance Work related with E.I and Lighting System Installed at various sites of Bolpur Electrical Section-II under Birbhum Electrical Division, PWD ,During the period for-365 days...including Holidays.
SCOPE OF WORK FOR ANNUAL MAINTENANCE OF ELECTRICAL INSTALLATION WORKS 1. Purpose of Maintenance The objective of preventive and corrective maintenance is to minimize electrical faults/breakdowns, prevent fire hazards due to electrical short circuits, and reduce ...
Laying of additional 300 Sqmm Cable along with Feeder st TC Complex for Load Enhancement
Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
REPAIR MAINT OF HT ELECTRICAL SYSTEM INCLUDING 33KV MRS AT ACE KLP WITH CERTAIN OTHER EXTERNAL ELECTRICAL REPAIR WORKS UNDER GE AWC MHOW
Supply and Fixing in repair of earthing with galvanised steel earth plate electrode 600 x 600 x 6 mm thick buried directly in... than 1.5 Metre below normal ground level connected to galvanised iron strip 32×6mm as earthing lead by means of nuts, bolts, check nuts, washers of galvanised iron or steel all as ...
Providing skilled semi skilled staff for electrical work and maintenace of allied electrical system at ward no.10 in A Zone(2025-26)
eProcurement System Government of Maharashtra Created By: Kakasaheb Mote Created Date/Time: 18-Mar-2026 12:14 PM Tender Title: Providing skilled semi skilled staff for electrical work and maintenace of allied electrical system at ward no.10 in A Zone(2025-26) Tender ID: 2025_PCMCP_1225183_93
Work of Laying of Earth Mesh Earthing of Sub Station Structure and Equipment Erection of Steel Structure and equipment Stringing of Bus Bar and Earth wires Jumpers Installation of Control panels cable laying and termination of cable 132 KV GSS KOTDA