Loading…
Loading…
6,478 results • Best match
work of Sudrikaran 11 KV line under EDC I MBD
For 11 KV Line, Double Pole structure with 13/11/9/8.5 Mtr. long PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, cutting holes complete work as per RESPO Norms.
02 Nos. Feeder Bifurcation work of existing 11KV Shivpuri Feeder amd Mahigwa Feeder Emanating from 33/11 KV Substation, Itaunja and Kumbhrawa in the work area of Executive Engineer 11KV amd LT Jankipuram, Lucknow Head of Business Plan 2026-27
Fabrication, erection of section type double pole suitable for making arrangement of 2 no. circuit with the help of 11 Mtr. Long ST pole fixing of straight MS channel 100x50 mm Top channel (2240 mm long) One No. dropper channel 100x50 mm (2240 mm long) 1 no. angle 65x65 x6 mm and other necessary clamps with nut and bolts for tracing cable fault in 11 KV XLPE cable 3x185 sqmm to prevent and remove forthcoming underground cable fault.
Construction of a Bridge at Ch.82.40 km on the Bangarapete Bagepalli (SH-05) road Sidlaghatta Taluk, Chikkaballapur District.
Steel Fabrication
Construction of a Bridge at Ch.74.85 km on the Bangarapete Bagepalli (SH-05) road Sidlaghatta Taluk, Chikkaballapur District.
Steel Fabrication
INSTALLATION OF MERIDIAN LIGHTS FROM SHAPUR GATE RING ROAD TO BASAVESHWAR CIRCLE IN BIDAR CITY. BDR254103469-GEN. KKRDB-MACRO FOR 2025-26
Steel Fabrication
INSTALLATION OF MERIDIAN LIGHTS FROM NAUBAD BASAVESHWAR CIRCLE TO MADIVAL CIRCLE NEAR BRIMS HOSPITAL IN BIDAR CITY. BDR254103470-GEN. KKRDB-MACRO FOR 2025-26. (SC RESERVED).
Steel Fabrication