Loading…
Loading…
29,776 results • Best match
Fabrication of universal joint moving units and MS Bends of different sizes and repairing of Non Return Valve Sluice Valve required for monsoon 2026 at Krishnashila Project
1.04 Fabrication of 10 Nos. MS Bend 90/120 digree for MS Pipe size 300/250/200 MM and applying a priming coat of approved steel primer all complete BI01010001010000000000000515BI0100001116 KG Excess(+) Full Conversion INR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Student Hostels; supply fabrication and istallation of food preparation units as per scope of work; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Student Hostels; supply fabrication and istallation of food preparation units as per scope of work; Service Provider
Making/fabrication of different types of worn-out shims (Saddle block, Top shim, side shim and propel assembly) of P and H-1900AL shovel of Khadia Project.
Scope of Work/Technical Specifications etc. Making/fabrication of different types of worn-out shims (Saddle block, Top shim, side shim and propel assembly).
Fabrication of 05 set coupling 04nos,coupling for 2000GPM and 06 nos,for 1000 GPM pump motor side and pump side of Topa project,Under Kuju Area.
10 Inch 8 Inch 6 Inch DIA MS PIPE BEND AND SHORT PIECES REDUCE FABRICATION BY CUTTING WELDING and ALLIED JOBS FOR AKWMC OCP AT KATRAS AREA.
Work Contract for Various fabrication work required for C and I Upgradation during before AOH in Boiler of Unit No. 4 at PH II,SGTPS, MPPGCL, Birsinghpur
1 Fabrication of Platform & Seal Box with necessary support 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos