Loading…
Loading…
29,895 results • Best match
Repairing of chute and allied fittings by fabrication work for smooth coal handling at Mini CHP of Pit No. B and 2 under Pandaveswar colliery, Pandaveswar Area
Repairing of chute and allied fittings by fabrication work for smooth coal handling at Mini CHP of Pit No. B & 2 under Pandaveswar colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Supply, fabrication, erection, modification, testing and alignment of deflector pulley in the conveyor belt arrangement of P-Q-R circuits of New CHP at Dipka Expansion Project.
Supply, fabrication, erection, modification, testing and alignment of deflector pulley in the conveyor belt arrangement of P-Q-R circuits of New CHP. Scope of Work: 1). Supply, fabrication, erection, testing of Deflector Pulley of following specifications, Size: 1800mm wide x 273mm dia x 90mm shaft dia including supply of bearing size: 22218E, Sleeve: H-3118, Bearing Block: SN-318, Shell thickness: 8/10mm including hanger bracket for fixing of deflector pulley with nut bolt etc. all complete and erection, testing and alignment of the conveyor belt structures.
Repair/Reconditioning /fabrication of worn-out column assembly components of 20 cusec Jyoti make (3 stage) 700 T1 A6, 20 cusecs discharge VT pump no. 02 installed at L.I.S. Ranjan
Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump-half coupling) of the unit 02, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly. Complete job 01 job Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each. Complete job. 01 job Transportation charges for shifting of worn-out items from LIS Ranjan to workshop and back shifting to site of installation after strengthening / reconditioning involving manual loading, mechanical transportation and handling charges. Complete job. 01 job Fabrication of heavy duty ERW flanged end shaft enclosing tube of 200 mm. dia. x 2000mm long, 6/8 mm. thickness, having flanges on either side (welded on inside of the pipe) with drilled and threaded 6 nos. holes to suit M20 x 50mm bolts.02 jobs Reconditioning of SS AISI-410-line shaft 70 mm dia. 2.15 mtrs. Long at worn out portions by way of rebuilding the worn out, undersize portions by remetalling with special SS welding electrodes in layers and then turning, grinding, polishing, finishing to true size and specifications including rebuilding, finishing of key ways to true size. Also removing & checking eccentricity of line shaft with dial gauge at various off sets. Removing deflection/eccentricity by heat treatment or on hydraulic press, removing of deflections on heads/ ends and then again checking the alignment of the shaft on lathe machine. P/F of new fabricated AISI-410-SS cotter pins of line shaft. Complete job. 03 jobs Reconditioning of 200 mm dia. x 2000mm length, ERW shaft enclosing tube by cutting, removing from both ends of 200 mm dia. shaft enclosing flanges and fitting of new flanges similar size as specification to each end of the tube which should have six nos. of M20 dia. size threads, MS welding to both ends of the flanges with main tube and then turning, facing both the ends in respect of all over accurate thickness, straightening and alignment, facing of the flanges. Complete job. 04 jobs Repairing of Guide spider by way of replacement of rubber bearings, nitrile rubber pads for arms, CS head screws M12 x 20mm, MS cover dia. 130mm with drilled 4 nos. holes for rubber bearing locking and locking screws M10 mm. 04 jobs Repair/reconditioning of AISI-410-SS muff coupling along with its top & bottom nuts by way of rebuilding at old worn-out portions with re-metalling with special SS welding electrodes, then turning, finishing to true required size and rethreading both the nuts and required portion of the coupling, finishing of all the surfaces of nuts and muff coupling for proper fitment along with rebuilding of key ways. Complete job. 02 jobs Repair /reconditioning of pump half coupling and coupling nut by way of rebuilding at old worn-out portions with re-metalling with special SS welding electrodes, then turning, finishing to true required size and rethreading the coupling nut for proper fitment along with rebuilding of top shaft key ways. Complete job 01 job Fabrication of C.I. guide spider set with three legs complete comprising of one no. Guide spider suitable for line shaft of size 70mm dia. three no.’s rubber pads and slotted CS M12 x 20mm screw, one no. Rubber bearing, one no. Cover for rubber bearing and bearing screws and washers.01 job Assembling of each column one by one with 70 mm shaft, 200mm internal tube and 500mm external pipe in sequence while lowering in the respective pit along with assembled bowl assembly. This includes fitting, lowering of line shafts, guide spiders, muff couplings, top shaft, tension tube, deflector tube, joining of discharge surging head with delivery line 500 mm dia. along with providing and fitting of relevant joining material, fire fly sheet, graphite packing, grease packing, 19 mm size nuts, bolts, washers, fitting and tightening after complete alignment, leveling etc. Complete job 01 job Testing of pumping unit which includes installation of 485 KW, 650 HP, 6.6 KV VT motor solid shaft BHEL make HT motor on the skirt and its alignment with respective pump half coupling, reconnection of dismantled cable connections of 6.6 KV, 3 phase to rotor, stator, slip-ring assembly, liquid rotor starter trifurcated sealing box and space heater, cleaning of all carbon brushes, connecting of motor half coupling with pump half coupling, checking all connections with proper alignments and adjustment and testing of pumping unit for its proper operation 01 job
ANNUAL RATE CONTRACT FOR HANDLING AND FABRICATION OF HT/LT LINE MATERIAL AND OTHER URGENT DAY TO DAY WORKS OF SD-STORES IN RESPECT OF JPDCL ELECTRIC DIVISION RAJOURI..
Prepration of Structure Materials by Fabrication by Cutting, Welding, Turning, Swaging, Punching, Drilling etc for complete prepration of item as per requirement/Standard.
Fabrication, Supply and Erection of 5Nos. Scouring Sluice Gates and its accessories of Budhadarha Check Dam in Gaisilet Block under Minor Irrigation Division, Padampur for the Year 2025-26.
i. Concrete cutting and chipping of civil structure for fixing of guide channel, Bottom Sill Beam and Cross beam of total volume 0.665m³ ii. Fabrication, supply and erection of shutter, Embedded parts and cross beam of shutter size-1700(w)x1500(h) by utilizing steel materials of total weight-729.19Kg iii. Supply, erection and fitting of bought out materials such as-Bottom flat rubber seal 80x10-1.70m, 32ØP-type rubber seal 80x10t-3.00m, Corner Seal-2nos, Hex bolts M12x70N-17nos, CSK screw-M12x70N-30Nos, Screw Rod 63Øx 2930 long, 65Kg CI gear Box Assembly-1Set, Suitable operating handle for 65Kg gear Box-1No., gate lifting pin 40Øx150l-1No., grease MP3-5kg, Mobil-1litre, Cross beam foundation & gear box Bolts and nuts-M16x150N-8Nos, Bronze Pad LTB-I-80x30x12-4nos, CSK screw for Bronze pad-16nos, SS steel flat-47.19Kg and SS electrode-251 nos etc. details as per estimate. This work includes concrete cutting, chipping, 2nd stage concreting, cost of all materials construction of coffer dam, dewatering by 10HP pump, all consumables, all labours, greasing, fitting of rubber, cleaning, cost of painting including cost of paints and labour, H/C of all tools and tackles & machineries, watch and ward, conveyance, trial, testing and commissioning etc. completed in all respect as per detailed in estimate.The cost is inclusive of contractor profit @7.5% and labour cess @1%.
Fabrication, Supply and Erection of 5Nos. Scouring Sluice Gates and its accessories of Marghat Check Dam in Gaisilet Block under Minor Irrigation Division, Padampur for the Year 2025-26.
i. Concrete cutting and chipping of civil structure for fixing of guide channel, Bottom Sill Beam and Cross beam of total volume 0.675m³ ii. Fabrication, supply and erection of shutter, Embedded parts and cross beam of shutter size-1700(w)x1500(h) by utilizing steel materials of total weight-735.68Kg iii. Supply, erection and fitting of bought out materials such as-Bottom flat rubber seal 80x10-1.70m, 32ØP-type rubber seal 80x10t-3.00m, Corner Seal-2nos, Hex bolts M12x70N-17nos, CSK screw-M12x70N-30Nos, Screw Rod 63Øx 3050 long, 65Kg CI gear Box Assembly-1Set, Suitable operating handle for 65Kg gear Box-1No., gate lifting pin 40Øx150l-1No., grease MP3-5kg, Mobil-1litre, Cross beam foundation & gear box Bolts and nuts-M16x150N-8Nos, Bronze Pad LTB-I-80x30x12-4nos, CSK screw for Bronze pad-16nos, SS steel flat-47.19Kg and SS electrode-251 nos etc. details as per estimate. This work includes concrete cutting, chipping, 2nd stage concreting, cost of all materials construction of coffer dam, dewatering by 10HP pump, all consumables, all labours, greasing, fitting of rubber, cleaning, cost of painting including cost of paints and labour, H/C of all tools and tackles & machineries, watch and ward, conveyance, trial, testing and commissioning etc. completed in all respect as per detailed in estimate. 05.The cost is inclusive of contractor profit @7.5% and labour cess @1%.