Loading…
Loading…
32,484 results • Best match
Erection of Elephant Proof Barricading using used rails along the boundary of Saraguru Range During 2025-26- Solarshed Gate Point To Kabeer Jameenu Pillar Point- 0.500 Kms.
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/we...
Construction of culvert in Kabina setuve vanadevaru Temple Kiragandur Bagilakandi- Teliphone exchange-Kalladi Road Ch 0.00 in Somwarpet taluk. (Protection wall) Head of a/c 3054-04-105-0-01-200 District and other road bridge maintenance
Steel Fabrication
Construction of retaining wall and other works to hosaritti-negaluru road at km 5.46 for the year 2025-26
Steel Fabrication
Maintenance of the Existing culvert at Ch 70.99 , 71.60 km on the MDR connecting Hirisave-Nonavinakere road in turvekere taluk Reserved For SC
Steel Fabrication
Providing barbed wire fencing to Nursery School Site at Kalapatti Neighbourhood Scheme Coimbatore District
... using two ply 10 gauge wire 5 rows horizontally and diagonally 2 lines etc., including steel fabrication for RCC posts, moulding charges, conveyance, labour charges etc., all complete in all ...
Providing barbed wire fencing to Health Centre Site at Kalapatti Coimbatore District
... using two ply 10 gauge wire 5 rows horizontally and diagonally 2 lines etc., including steel fabrication for RCC posts, moulding charges, conveyance, labour charges etc., all complete in all ...